Laserfiche WebLink
F ROM FI AMF M TNI rinp r r-AX NLI dO9 3'34 4584 oc-t le X005 03 41 r'ri Pi <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br />' PQu N SAN J'OAQUIN COUNTY <br /> wti� Donna K lk rau, R t',K 5 (filo Earp +-►YSOPs <br /> < olrectar 8 <br /> Telephone (209)468-3420Dooer 304 East Weber Avenue,Tfurd FIOOx Carl Borgman,R E H S <br />' Al Olsen, RE HS' Stockton,Caltforma. 95202-2708 Mike Huggins, R F H s R D I <br /> Pro�rulre lifanaglay W Wilwn R E N S <br /> '°�lFoaa• <br /> Laurie A_ cotalle, 9 h H i F2� 4�41}1�$ Margwel Lagar►o R t3 H 5 <br /> dX <br /> Program Manager - Robert McClellon, R E H S <br />' VVebsrce www s�gUv,oxg/ehd/ Jeff Carruescn R 1;H S <br /> PETE GRAFFIGNA <br /> FLAME MINI-MART <br /> 1301 W KETTLIEMAN LANE <br /> LODI CA 95242 <br />' RE' FLAME MINI-MART SITE CODE, 1342 <br /> - 1301 W KETTLEMAN LANE <br /> LODI CA 95242 <br />' WORK PLAN REVISED SITE ASSESSMENT ADDENDUM <br /> DATED JUNE 24,2005 <br /> PREPARED BY AGE <br />' APPROVES] IN <br />' ADEgUAT9 AND NECESSARY ELEMENTS OF THE WORK PLAN[H&S 25286 10 (c)(3)1 <br /> 1 To perform batch groundwater extraction from MW-2 E HD's approval is for two events, two <br /> months apart <br />' 2 To install one ozone sparge well and perform a zone sparge pilot test <br /> 3 To install 3 additional on-site shi;iilrsw monitonng wells <br /> 4 To install 4 additional soil bonngs to 70 feet bgs in the area of the former usTs and dispenser <br /> Island to determine if h[gh concentrations of sorbed contaminants are present If high levels <br />' of soil contamination exists and soil remediation is warranted vapor extraction well installation <br /> will be considered utilizing the open bQrings <br /> 5 To collect sod samples from the borings and groundwater samples from MWs for analysis <br />' TPH-gas, BTEX, and foal additives including MTBE <br /> 6 To prepare a report of findings including the results of the batch groundwater extraction pump <br /> test and the ozone pilot test <br />' COMMENTS-6tQ CONDITIONS <br />' 9 All required permits must be procured prior to beginning work <br /> 2 The report of finding must be prepared and submitted to EHD and CVRWQDB by November <br /> 15, 200S <br /> 3 EHD, In a letter dated May 17, 2005, previously approved batch groundwater removal, <br />' installation of 3 MWs, installation of an ozone well, and ozone pilot testing <br /> c� y <br /> DATE 4 I A—I BY ^" <br /> Hadln Knoll. Senior REHS-f209)468-3442 <br /> Ca AGE <br />