My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DARLENE
>
475
>
2900 - Site Mitigation Program
>
PR0508044
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 11:39:43 AM
Creation date
2/12/2020 10:00:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0508044
PE
2950
FACILITY_ID
FA0007906
FACILITY_NAME
GLENBRIER ESTATES SCHOOL SITE
STREET_NUMBER
475
STREET_NAME
DARLENE
STREET_TYPE
LN
City
TRACY
Zip
95377
APN
24827047
CURRENT_STATUS
01
SITE_LOCATION
475 DARLENE LN
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
kTJ KLEINFELDER <br /> APPENDIX A <br /> TYPICAL KLEINFELDER FIELD PROTOCOL <br /> A-1 FIELD PREPARATION <br /> Before performing work in the field. environmental staff review the scope of work, prepare a <br /> health and safety plan, coordinate the work to be done with their supervisor, assemble the <br /> necessary sample containers, and check. calibrate and clean equipment to be used in the field. <br /> When underground utilities may exist at a site where subsurface soil samples are being collected. <br /> USA Underground is contacted with the boring locations and the scheduled date of drilling, or a <br /> utility locating firm is employed to check the boring locations. <br /> A-2 SUBSURFACE SOIL SAMPLING <br /> A-2.1 Drilling <br /> Subsurface soil samples are collected from soil borings. Soil borings are advanced using a truck- <br /> mounted drill rig, equipped with 8-inch hollow stem augers. The borings can be advanced <br /> vertically, or at an angle up to 45 degrees from vertical. During drilling, an experienced <br /> environmental geologist classifies the soil, logs the lithology and collects soil samples for <br /> laboratory analysis. A sample boring log form is attached at the end of this appendix. <br /> A-2.2 Decontamination of Equipment <br /> To reduce the potential for cross-contamination, augers and associated equipment are steam <br /> cleaned prior to drilling each boring. In addition, sampling equipment is cleaned with a <br /> trisodium phosphate wash and rinsed with distilled water prior to collecting each soil sample. <br /> A-2.3 Collection of Soil Samples <br /> Soil samples are collected approximately every 5 feet for field screening, lithologic logging, and <br /> potential chemical analysis. Samples are collected by advancing the boring to a ypoint <br /> immediately above the desired sampling depth and then driving (vertical borings) or pushing <br /> (slant borings) a Modified California Sampler, lined with three brass tubes, into the undisturbed <br /> soil. The sampler is then removed from the bottom of the boring. The ends of the bottom (third) <br /> tube are covered with Teflon and sealed with tight-fitting plastic caps. <br /> 20-4202-01.P02/20ISR669 Pa2eA-I <br /> Copyright 1995,Kleinfelder,Inc. October 2s, 199S <br />
The URL can be used to link to this page
Your browser does not support the video tag.