My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
0
>
2900 - Site Mitigation Program
>
PR0523626
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 12:21:04 PM
Creation date
2/12/2020 11:07:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0523626
PE
2950
FACILITY_ID
FA0015947
FACILITY_NAME
IN THE PUBLIC RIGHT-OF-WAY
STREET_NUMBER
0
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
W FREMONT ST
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RCE� V L - OR EARTH TECHNOLOGIES INC <br /> 188 Frank West Circle Suite I <br /> JUL 1 9 2005 Stockton CA 95206 <br /> Phone 209.234.0518 <br /> ENVIRONMENT H*AJH FAX 209.234.0538 <br /> CONDOR PE-RMIT/SERViCES www.condorearth.com <br /> July 8,2005 <br /> Harlin Knoll <br /> San Joaquin County Environmental Health Department <br /> 304 E.Weber Avenue,Third Floor <br /> Stockton, CA 95202-2708 <br /> Subject: Addendum to Phase H Environmental Site Assessment Work Plan for the Buena Vista <br /> Storm Drain in Stockton,Condor Project No.4038D <br /> Dear Mr. Knoll: <br /> This is an addendum to the Phase II Environmental Site Assessment Work Plan, dated February 7, 2005, <br /> prepared by Condor Earth Technologies, Inc. (Condor) for the Buena Vista Storm Drain project in <br /> Stockton, California (Figure 1, attached). Kjeldsen Sinnock Neudeck, Inc. (KSN) retained Condor to <br /> conduct a Phase II Environmental Site Assessment (ESA) for portions of the right-of-way areas of West <br /> Fremont Street between Carlton Avenue and Buena Vista Avenue, San Juan Avenue between West <br /> Fremont Street and the southern end of San Juan Avenue, and Buena Vista Avenue between Flora Street <br /> and the southern end of Buena Vista Avenue. The Phase II ESA was conducted to investigate the <br /> potential for contaminants in groundwater that may be encountered during construction activities. <br /> The Phase II ESA was conducted on March 15, 2005. The results of the Phase II ESA were reported in <br /> the Phase II Environmental Site Assessment Report dated March 30, 2005. A low concentration of <br /> methyl tertiary-butyl ether (MTBE) was detected in the groundwater sample collected from the boring <br /> (GP-5) installed in front of the property located at 1930 West Fremont Street. KSN has requested Condor <br /> conduct additional investigation of the lateral extent of MTBE contamination in groundwater in the <br /> vicinity of boring GP-5. <br /> During the previous Phase II ESA fieldwork, the borings were left open with temporary screen in each <br /> boring for the purpose of allowing the groundwater level to equilibrate in the borings. Depth-to-water <br /> measurements were taken at the end of the field day from all of the open borings, and the groundwater <br /> samples were collected immediately after the depth to water measurement was completed at each boring. <br /> During the next phase of fieldwork, groundwater samples will be collected as soon as possible after each <br /> boring is completed. The groundwater samples collected from the borings will be analyzed for fewer <br /> constituents than the samples collected during the previous fieldwork. The only constituent detected in <br /> the groundwater samples collected previously was MTBE, so the groundwater samples collected during <br /> the next phase of fieldwork will be analyzed only for potential gasoline constituents. <br /> Four direct push borings will be installed in the City of Stockton right-of-way on West Fremont Street. <br /> Two of the borings will be installed on the south side of West Fremont Street approximately 50 feet east <br /> and west of the location of boring GP-5. Two of the borings will be installed on the north side of West <br />
The URL can be used to link to this page
Your browser does not support the video tag.