Laserfiche WebLink
k%j KLEINFELDER <br /> 3.2.3 Soil Boring Grouting <br /> Wells will be abandoned within one week after laboratory analysis have <br /> been completed. The well casings will be pulled using a drill rig. Each <br /> well will then be ccupletely grouted froin the bottom up to the ground <br /> surface using a tremie pipe. The grout will consist of cement/bentonite <br /> grout- <br /> 45-88-01 11 <br />