My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
3200
>
2900 - Site Mitigation Program
>
PR0544641
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 1:39:52 PM
Creation date
2/12/2020 11:46:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544641
PE
2965
FACILITY_ID
FA0001783
FACILITY_NAME
HOLMAN INVESTORS LLC
STREET_NUMBER
3200
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
12202019
CURRENT_STATUS
02
SITE_LOCATION
3200 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIR):._._,�NTS ORDER NO. 5-01-055 -13- <br /> TRI VALLEY GROWERS PLANT NO.4 <br /> STOCKTON, SAN JOAQUIN COUNTY <br /> of a technical report that describes, at a minimum, the results of a field demonstration project <br /> conducted over the course of at least two years on similar soil types as those in the Designated <br /> Disposal Areas and using similar food processing wastewater as that described in Finding No. <br /> 15. Any proposed field demonstration project will be regulated under the terms and conditions <br /> of separate waste discharge requirements. As such, at least 120 days prior to conducting the field <br /> demonstration project, the Discharger(and/or other reasonable party) must submit a complete <br /> Report of Waste Discharge for the proposed field demonstration project. <br /> 12. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher nitrogen <br /> loadings than that specified in Effluent Limitation No. C.2 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other <br /> violation of the terms and conditions of this Order, then this Order may be reopened for <br /> consideration of revision of nitrogen loading limits. The demonstration shall include the <br /> submittal of a technical report that describes, at a minimum, the results of a field demonstration <br /> project conducted over the course of at least two years on similar soil types as those in the <br /> Designated Disposal Areas and using similar food processing wastewater as that described in <br /> Finding No. 15. Any proposed field demonstration project will be regulated under the terms and <br /> conditions of separate waste discharge requirements. As such, at least 120 days prior to <br /> conducting the field demonstration project, the Discharger(and/or other reasonable party)must <br /> submit a complete Report of Waste Discharge for the proposed field demonstration project. <br /> 13. The Board will review this Order periodically and may revise requirements when necessary. <br /> I, GARY M. CARLTON, Executive Officer, do hereby certify the foregoing is a full,true, and correct <br /> copy of an Order adopted by the California Regional Wate Quality Control Board, Central Valley <br /> Region, on 16 March 2001. <br /> RY CARLTON, Executive Officer <br /> TRO: 3/16/2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.