Laserfiche WebLink
I <br /> July MONTHLY MONITORING REPORT <br /> PLANT 4 <br /> WEEKLY TOTAL NITROGEN <br /> WEEKLY <br /> DATE FLOW TKN TKN NO3-N NO3-N TOTAL N <br /> (MG) (PPM) M (PPM) (0) (#) <br /> July -- - --- - ---- <br /> 1 st-7th 1.36 1.00 11.3 0.50 5.7 17.0 <br /> 8th-14th 3.20 5.30 141.8 0.50 13.4 155.2 <br /> 15th-21st 9.80 52.00 4,253.9 3.50 286.3 4,540.2 <br /> 22nd-31st 19.08 38.00 6,053.8 0.50 79.7 6,133.4 <br /> MONTHLY TOTAL —^10,846 Lbs. <br /> TOTAL NITROGEN =[TKN)+[NO3-N) <br /> L <br />