Laserfiche WebLink
.0A#%0 Of illUsiEEs SAN JOi _NUIN LOCAL HEALTH DISTRICT aEft"No <br /> JbwHa Cwltawtaon. Ptaa. Gly of Lodi <br /> raf <br /> AM tcla tl v Vanucci. <br /> SocCon 1601 East Hazelton Avenue. P. O. OOK 2009 San J04quln count <br /> AnthonNla V.n saon..n Gly of E.�.lo; <br /> EGA Plen.nlal Stockton, Callfolnia 85201' City <br /> Fwn aupt»a CAY of <br /> Oanlal L. Flora* M/46"781 city of Ripon <br /> John O. Mae(. M.o. Clly of Stockton <br /> William J. Wade / Joel Khanna, M.O.. M.P.H.. 0181dcl health 011tc4w San JoaquinGlyCityolTracy <br /> 14� County <br /> Id ary Anna low <br /> 5i a/l San Joaquin County <br /> F a c i I ity Name <br /> Address [ I dc) motzEEc-4td Go to 2-T S71cl <br /> Date of Inspection ( 2 -/O -� (o <br /> Inspector rr, <br /> MONITORING ALTERNATIVE 15 <br /> VAnnual precision test on tank(s) and piping. <br /> _V Oally-inventory reconciliation with submission of quarterly statement 'regarding <br /> compliance with allowable variation. <br /> i <br /> Pipeline leak detectors on pressurized piping. <br /> ily operational check of suction piping function. <br /> /Calibrated meters for inputs and withdrawals: <br /> —3/weights and Measures sticker <br /> Certification by qualified repairman <br /> Implementation of this monitoring alternative requires that the following CIRCLED items <br /> be completed by the specified dates. <br /> I(DPrecision test(s) must be performed by 1 -30 -g7 and results submitted to <br /> this office within 30 days of the test. <br /> 2. Pipeline leak detectors must be installed on pressurized piping by <br /> I — I <br /> 3. Daily inventory reconciliation must be started immediate l . with records maintained <br /> at the facility for review. <br /> 4 . Document daily check of suction piping function starting immediately. <br /> ID Submit quarterly statement to this office that allowable variation on inventory <br /> reconciliation has not been exceeded or a list of dates and v riations that <br /> exceeded allowable. * The first statement is due by I -- 0- <br /> 06- Dispenser meter(s ) must be calibrated by I - � �77 <br /> with copy of <br /> Certification or Weights and Measures sticker number submitted to this office. <br /> If the above compliance dates cannot be met , contact this office prior to the specified <br /> date . <br /> If allowable daily inventory variation is exceeded, refer to Section 2644( f ) for <br /> required actions . <br /> 3-86 UGT I <br />