My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2900 - Site Mitigation Program
>
PR0523599
>
COMPLIANCE INFO_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:23:18 PM
Creation date
2/12/2020 3:01:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1
RECORD_ID
PR0523599
PE
2960
FACILITY_ID
FA0015929
FACILITY_NAME
PORT OF STOCKTON BLDG #16
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95201
CURRENT_STATUS
01
SITE_LOCATION
305 FYFFE AVE BLDG 16
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILDING 16: SITE HEALTH AND SAFETY PLAN <br /> 1 ORGANIZATIONAL STRUCTURE <br /> (In Compliance with 29 CFR 1910.120(b)(2)) <br /> This chapter of the Health and Safety Plan describes lines of authority, responsibility and <br /> communication as they pertain to health and safety functions of the site. The purpose of this <br /> chapter is to identify the personnel who impact the development and implementation of the <br /> site health and safety plan and to describe their roles and responsibilities. This chapter also <br /> identifies other contractors and subcontractors involved in work operations and establishes the <br /> lines of communication among them for safety and health matters. <br /> The organizational structure of this sites health and safety program is consistent with OSHA <br /> requirements in 29 CFR 1910.120(b)(2) and provides the following site-specific information: <br /> • The general supervisor who has the responsibility and authority to direct all hazardous <br /> waste operations <br /> • The site safety and health officer who has the responsibility and authority to develop <br /> and implement this HASP and verify compliance <br /> • Other personnel needed for hazardous waste operations and emergency response and <br /> their general functions and responsibilities <br /> • The lines of authority, responsibility and communication for safety and health functions <br /> 1.1 ROLES AND RESPONSIBILITIES <br /> All Personnel and visitors on this site must comply with the requirements of this HASP. The <br /> specific responsibilities and authority of management, safety and health, other personnel on <br /> this site are detailed in the following paragraphs. A site organizational chart illustrating the <br /> hierarchy of personnel and lines of communication within this company and with additional <br /> contractors on site is found in Figure 1-1. <br /> 1.1.1 Project Manager <br /> The Project Manager (PM) for this site is Steve Michelson. The PM has responsibility and <br /> authority to direct all work operations. The PM coordinates safety and health functions with <br /> the Site Safety and Health Officer (SSHO), has the authority to oversee and monitor the <br /> Environmental Risk Services,Corp. <br />
The URL can be used to link to this page
Your browser does not support the video tag.