Laserfiche WebLink
Dirt B-a O <br /> MW-4(Z) <br /> B-3 <br /> B-9 • <br /> •B-2 — mW-i_—� <br /> 16-1 )0� 16-2 J B-5• <br /> Asphalt <br /> B-1• <br /> B-7 Qo <br /> B-6 @ /————\ B-10 Qo <br /> —— I 16-3 ®MW-2) <br /> - B-$ • <br /> Asphalt <br /> `m II v <br /> BLDG 16 I IL ) <br /> MW-3® y <br /> l' O <br /> Z <br /> S <br /> Fence <br /> Z <br /> Dirt/gravel m <br /> LEGEND <br /> MW-1® Monitoring well <br /> B-3 @ SWBZ soil boring Note: ti <br /> USTs,fuel dispenser islands,piping and <br /> B-1 • Paired SWBZ and aquifer 2 canopy removed September 10-18, 1997, 0 10 20 30 Feet <br /> soil borings adapted from AGS, Inc.,2001. <br /> i \ Former location of UST or fuel ERS Building 16 - Site Plan Figure <br /> dispenser islandPort West Complex, Rough and Ready IslandX <br /> ices Corp Risk Port of Stockton, California <br /> —-- Margin of excavation Services Corporation <br />