Laserfiche WebLink
Verification of the tank inertion will be performed <br /> using a Gas Techtor model 1314 Combustible Meter. <br /> Tanks will be documented at 10% L.E.L. and 10% Oxygen <br /> prior to removal per local regulatory requirements. <br /> In case of fire: <br /> Extinguish with dry chemical, foam or carbon dioxide. <br /> If fire cannot be extinguished within 30 seconds, call <br /> Fire Department immediately. <br /> Water may be ineffective on fire. <br /> 3.4.3 TRAFFIC HAZARDS <br /> Stay at least 10 feet away from moving equipment. If closer than <br /> 10 feet: <br /> 1) Keep equipment in sight at all times; <br /> 2) Inform the operator of your location at all times. <br /> 3) Wear a Reflective Safety Vest around moving <br /> equipment to be more visible. <br /> The working area will be closed to traffic with barricades, <br /> caution tape, cones and other traffic control equipment. If the <br /> area cannot be barricaded, a flagperson will be assigned to direct <br /> traffic . <br /> No unauthorized or unessential vehicles will be allowed to enter <br /> the barricaded area. <br /> 3.4.4 OPEN EXCAVATION PIT HAZARDS <br /> Open excavation pits shall be clearly marked and barricaded. No <br /> confined space entry will be allowed. If a person falls into an <br /> open pit: <br /> DO NOT ENTER THE EXCAVATION PIT. <br /> - If the person is conscious and can move, lower a ladder <br /> into the pit so that the person can climb out. <br /> If the person is unconscious, call the Fire Department. <br /> 3.4.5 UNDERGROUND POWER LINE HAZARDS <br /> Call U.S. Alert at least 3 days before commencing excavation work. <br /> The owner will identify aboveground structures and utilities and <br /> will provide as-built blueprints for contractor use prior to start <br /> of project . If the location of underground utilities such as <br /> water, sewer or electrical lines is still unclear, the contractor <br /> will obtain the service of a utility location company before <br /> beginning any excavation. An area for excavated soil stockpile <br /> will be provided adjacent to the excavation. <br /> 7 <br />