Laserfiche WebLink
U � <br /> Z <br /> KEYNOTES .,Fi <br /> m <br /> 1. NEW UNDERGROUND STORAGE TANKS (USTs). DOUBLE-WALL FIBERGLASS REINrORCED PLASTIC (F.RP.) TANKS BY XERES, W/ BRINE FILLED {x in Q 0 u <br /> ANNULAS. ONE AT 15K 87 OCTANE UNLEADED GASOLINE. ONE AT 15K SPLIT INTO SK 91 OCTANE UNLEADED GASOLINE AND -1K DIESEL. w (N0 � <br /> 2. NEW (N) TANK VENT RISERS ON RISER ACK. INSTALL LISTED FLEX CONNECTORS AT ASE AND CONNECT TO TANK VENT PIPING, WITHIN a <br /> RBX Z �� <br /> DOUBLE WALLED, BRINE FILLED INTERSTICE, CONTI AINMENT / TERMINATION SUMS'. CONFIRM LOCA";'"IDN. Z Z ® L � M <br /> 3. CLEAN AiR SEPARATOR TANK. INSTALL PER MNFR. RECOMMENDATIONS. Il' O <br /> 4, NEW VACUUM MONITORED; CONTAINED TANK VENT PIPING, FIBERGLASS REINFORCED PLASTIC (F.R.P.), MINIMUM PRIMARY PIPE SIZE TO BE � � � �� <br /> uj <br /> 2"0. SLOPE BACK TO TANKS AT 118" PER FOOT, MINIMUM. <br /> ep `- <br /> �- 5. NEW DISPENSERS ON NEW DOUBLE WALLED, BRINE FILLED INTERSTICE, UNDER DISPENSER CONTAINMENT (UDC) / SHEAR VALVE SYSTEMS, <br /> W/ FLOAT SWITCH SUMP PROBES, TYPICAL. CONFIRM DISPENSING MODELS W/ EQUIPMENT LIST. CONFIRM DIESEL LOCATION(S). PROVIDE � <br /> CONDUIT, SEAL-OFFS AND WIRE PER MNFR, INSTALLATION PROCEDURES. Tlt'PICAL. <br /> H A M M E R L. A N E (0. NEW VACUUM MONITORED, CONTAINED PHASE f I VAPOR RECOVERY PIPING, F.R.P., MINIMUM 3"0 PRIMARY PIPING FROM DISPENSERS TO <br /> GASOLINE TANKS. 2" PRIMARY PIPING OK TO SINGLE DISPENSER. SLOPE TO TANKS AT 1/8" PER FOOT, MIN. <br /> 1 NEW VACUUM MONITORED, CONTAINED F.R.P. PRODUCT PIPE W/ 2"0, MINIMUM, PRIMARY PIPE, T'YPIC,;AL. SLOPE TO TANKS AT 1/a" PER FOOT, <br /> MIN, <br /> S. TANK ANNULAR Rf5ER, W/ HYDROSTATIC PROBE AND MANWAY, TYPICAL OF: 2. <br /> _ .- _ _--Y -- __-_._------ ~ uj <br /> Ex15T. Roan i=AsEMr�=�i*, TT-F. �\ S. NEWAUTOMATICTAMC GAUGES WAN TURBINE SUMP; TYPICAL. >to 0-) X <br /> � <br /> W %d JA_ <br /> 10o NEW SUBMERSIBLE TURBINE PUMPS (STP), TYPICAL, W/9N DOUBLE WALLED, 1BRINE FILLED INTER"['ICE, F.R.P. CONTAINMENT SUMP W/ FLOAT W W U } U <br /> EXIST. PROf=ERT1" LINE, TTP. -- -- -- -- -- -- _—� <br /> SWITCH SUMP PROBE, LID, AND MANWAY ASSEMBLY. J X f Qtu <br /> _m <br /> �/�+ 11. NEW ENHANCED VAPOR RECOVERY (EVR) TANK FILL ASSEMBLY W/ 5 GALLON (MIN.) FILL CONTAI,,MENT (TYPICAL OF 3) AND 5 GALLON W x Z 0 1 <br /> 40, (M1N.) CONTAINMENT FOR AT PHASE I VAPOR RECOVERY AT GASOLINE TANKS (TYPICAL OF 2), LAN DOUBLE WALLED, BRINE FILLED �' 1 � !fit <br /> INTERSTICE, CONTAINMENT SUMP, W/ FLOAT SWITCH SUMP PROBE, AND MANWAY ASSEMBLY. Q Ili m Q) U <br /> a GAL tRfiNs ® o_ OL c17 m ° }— <br /> a2 F�UTUR iR,o.iu Llai s, _ 12. BACKFILL TRENCHE5 W/ PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY COVER AND PAVNc� BASE. PROVIDE CONCRETE 4" THICK Q 1 `o <br /> W - --�_ _ _ <br /> �RORQs�t�, rrR MIN. OVER PEA GRAVEL. in < �U <br /> t Lu <br /> 13. NEW CONCRETE DRIVE SLAB, MINIMUM 9" THICK W/ #4 BARS AT i8" O.C. BOTiH WAYS, OVER 3" OF 3/4" CRUSHED ROCK OVER AGG. BASE (AT m <br /> 8-' VALL DRIVE 5LA55 EXCEPT OVER PEA GRAVEL BACKFILL). Q <br /> 11 <br /> e, I <br /> 141 <br /> I 14. NEW 12" THIC<% , (AT SU" BURY), CONCRETE TANK SLAB W/ 04 RESAR AT 16" OC. DOTH WAY5. E z <br /> STS OI I� �� <br /> LI \ <br /> lel <br /> ILI T rp, coNSr. `� � ��, -_ __- = _ � PETROLEUM PANELS, CONTROLS, MONITOR CONTROLS AND ALARM, IN EXISTING 5UI1...DING, INSTALL NEW MONITORING, CONTROLS AND v <br /> EASE'"TENT <br /> EXPIRES O ` <br /> "��� +�► DISPENSER INTERFACE COMPONENTS, AS REQUIRED. <br /> 117L�N Oro <br /> ' e / ���'.�` 11� <br /> 4 Il g 16. NEW EMERGENCY SHUT-OFF (ESO) W/ VISIBLE SIGN, 5EE GENERAL NOTES. CONFIRM LOCAT[ON(S), <br /> 9 10 Illy ` 1. NEW CONC. FILLED BOLLARDS, TYPICAL. ro" SQ., 42" HIGH, INSTALL PER DETAIL. <br /> 12 1� 19 It CX a IS. CONTRACTOR SHALL PAINT ALL EXPOSED METALS, UNLESS PREFINISHED, LW/ SUITABLE PAINT IN APPROVED COLORS. <br /> ® _ <br /> I S I 3 a 15. PIPING IS SHOWN SCHEMATIC, AND MAY BE EXAGGERATED FOR DRAFTING CLARITY. VARIATION6 DUE TO FIELD CONDITIONS FOUND ARE . Lu �p <br /> t� EXPECTED. w fu cv <br /> 20� INSTALL NEW 500 COAL_, ABOVEGROUND, D.W. LUBE CUBE WASTE OiL TANK, PER MNFR'S. REQUIREI�IENTS. PROTECT W/ POLLARDS AS REQ'D., 0 N <br /> PER CALIF. FIRE CODE (CFC) 8001.113. LOCATE PER CFC T902.2.2.ro AND CFTC TABLE -1902.2-E. <br /> ..1 leo ti0 <br /> GENERAL NOTES <br /> W �.E. I � ', t <br /> t / � <br /> I A. PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED IN ACCORDANCE WITH UFC STANDARD 10 1 ERWISE REQUIRED BY -�. <br /> i I I e <br /> FOOD MART 1 '� ARTICLE S (UFC -1901.5.3). INSTALL AT LEAST TWO PORTABLE FERE EXTINGUISHERS (FE.) W/ A M ;PATINE* DF 4-A, 40-B:C AS 5HOWN. <br /> a 1 1-f a I I {�•T•R� GALTRANS No. 15IDg6-I THESE EXTINGU� 8HERS TO BE AFFIXED TOA LOCATION ON A MOUNTING BR/ACKET' OR INA Ffi� E'•<TINGUISI-IER CABINET,. <br /> ® l <br /> i L-----'A"_R-"-'—"'-""""""""""""—'^—'k—A_____'� a E3. A CLEARLY LABELED, MANUALLY OPERATED PUMP MASTER SWITCH SHALL BE PROVIDED 1N AN Apf''ROVED LOCATION U1/IN 100 FEET, SU'f' <br /> ti <br /> NOT NEARER THAN 20 FEET TO, ANY DISPENSER WHERE SUCH MASTER 5WITCH fS NOT V[515LE FROM ALL DISPENSERS, THE LOCATION Z <br /> THEREOF SHALL BE IND ICATED 15Y APPROVED SIGNS, SIGNS IDENTIFYING 'THE PUMP MASTER SWITCH SHALL BE LABELED "EMERGENCY <br /> s FUEL SHUTDOWN DEVICE". THE MASTER SWITCH ON ALL INDIVIDUAL PUMP CIRCUIT SWITCHES SHALL BE SET IN THE 11OF1=" POSITION BEFORE <br /> CLOSING THE STATION FOR BUSINESS AT ANY TIME. (UFC 5201.53) "J 0 N T- <br /> I a C. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PF_R 1°°'fANUFACTURER'6 INSTRUCTIONS, APPLICABLE CODES AND W (P Q 1 <br /> STANDARDS, THE PLANS AND SPECIFICATIONS, AND LOCAL AGENCY REQUIREMENTS. = O Ll U U Q <br /> tIi <br /> e / i D. TANK 4 DRIVE SLAB CONCRETE SHALL BE CAPABLE OF PASSING A MINIMufti COMPRESSIVE STRENGTH OF 2500p si AFTER 28 DAYS. -J <br /> EXPANSION JOINTS AT DRIVE AND ISLAND SLABS SHALL BE SEALED U!/ FUfEL COMPATIBLE MATZR.iAL5. w lu <br /> I 1 MONITORING NOTES z <br /> � Q <br /> MIN. 5 20 <br /> oTYP_ I THE UNDERGROUND STORAGE TANKS (USTs), TANK SUMPS, VENT TRANSITION / CONTAINMENT SUMP, AND ':ANDER DISPENSER CONTAINMENT (UDC) � cp <br /> ExIsl AR iN 4' MAX. � o a 'fa <br /> SUMPS ARE ALL DOUBLE WALLED, WITH BRINE FILLED INTERSTICE, H`-DROSTATICALLY MONITORED. 4-; L SUMPS ARE ALSO MONITORED SY A r <br /> I TYP. ^� I I LIQUID 5EN51NG PROBE W/1N EACH SUMP, <br /> 6 <br /> THE PIPING IS ALL DOUBLE WALLED, WITH A VACUUM FILLED INTERSTICE, WHICH [S+ MONITORED FOR THE PRESENCE OF LIQUID AND CHANGES IN <br /> THE VACUUM PRESSURE W/IN THE TURBINE SUMPS. THE VENT PIPING INTERSTICE IS MANIFOLDED IN TI4E VENT TRANSITION / CONTAINMENT SUMP <br /> AND MONITORED WAN THE 91 OCTANE GASOLINE SUMP. THE VAPOR RECOVERY PIPING INTERSTICE IS 1"fANIFOLDED AND MONITORED WAN THE 87 <br /> OCTANE GASOLINE SUMP. EACH PRODUCT PIPE INTERSTICE 15 MONITORED WAN ITS TURBINE SUMP. <br /> THE PRESSURIZED PRODUCT PIPING IS MONITORED BY AN ELECTRONIC LINE LEAiK DETECTOR, LOCATn-D AT THE SUBMERSIBLE TURBINE PUMP <br /> (STP) MANIFOLD ASSEMBLY, WHICH WILL AUTOMATICALLY SHUT DOWN THE TUR51N = IF AN ALARM OCCL[6. <br /> AUTO STP SHUTDOWN WILL ALSO OCCUR ON A LIQUID-SENSING PROBE ALARM TH47 15 WAN A SUMP T44T HAS PRESSURIZED PRODUCT PIPING, Le, <br /> TURBINE SUMPS AND UDCs. LIQUID-SENSING PR05ES WAN SUMPS THAT HAVE NO f FRES5URIZED PROD'JiST PIPING, f.,9. FILL SUMPS AND THE VENT } <br /> TRANSITION / CONTAINt-TENT SUMP, WILL ALARM ONLY, W/O STP SHUTDOWN, VACUUr-1 SENSORS WILL AL4.PM ONLY, WJO STP SHUTDOWN, IN THE tli <br /> AE3SENCE OF LIQUID DETECTION. THE HYDROSTATIC PROBE FOR THE UST INTERSTICE WILL ALARM ONLY, W/O STP SHUTDOWN. <br /> AUTO STP SHUTDOWN WILL ALSO OCCUR IF ANY OF THE MONITORING SYSTEM FAILS OR IS D15CONNECTFD, <br /> PETROLEUM S I T E PLAN PETROLEUM SHEET INDEX � <br /> SCALE: 1" = 20' (USE GRAPHIC SCALE FOR REDUCED PLOTS) PLAN <br /> > � a� <br /> 0 20 40 80 s�1 �� �����,. ,, � FET-1 PETROLEUM SITE FLAN iv,� <br /> ENVIRONMENTAL HEALTH DEPARTMENT J LL u <br /> 3p4 E WE13ER AVE THIRD FLOOR a '� <br /> STOCKTON CA 95202 <br /> PET-2 TAN< SECTION AND SLAE5 � � � :3ly 0 � <br /> (209)468-3420 z p p `' <br /> W <br /> Approved Wre���5 PET-3 TANG SECTION AND 6LA5 (SPLIT TANK), � - "', <br /> ❑ Approved with changes: See Remarks O � Q z�p���u�t � <br /> Disapproved: See Remarks _ 1�1Im <br /> J o j z ° �- <br /> SITE PLAN DEVELOPED FROM PRINT COPY OF CALTRANS AF'PRA{SAL MAP. PET PT�OLuI" SYSTi�f 1� TILB N a a <br /> THIS IS NOT A SURVEY. Re ams ( <br /> � <br /> PET-5 PETROLEUMPETROLEUMSYSTE1~i DETAILS,DETAILS, z� Vo wo <br /> �gE� ��c�� a o Q �o <br /> Date BYE°$ <br /> al extends orgy to that which is shown and described a <br /> Appro ora rove anyomission a PET-6 PETROLEUM ELECTRICAL BITE FLAN � ��� <br /> hereon and does not authorize Pp <br /> deviation from requirements of state laws or local ordinances- Q o <br /> 1IET-`I GENERAL CONDITIONS, WOR<5CO E � �o.c 6ee40��~ <br /> 1LEly.3-3x—o7 <br /> �0� cAL <br /> PET = 1 <br /> OF7 5HEETS <br />