Laserfiche WebLink
Y; <br /> 1 <br /> FUEL TANK REMOVAL/CLOSURE PLAN <br />` FACILITY: SHELL OIL COMPANY <br /> OWNER: SHELL OIL COMPANY <br /> 100 HOWE AVE. , SUITE 160N <br /> SACRAMENTO, CA 95825 <br /> TANK(S) TO BE REMOVED: 1 EA 550 GALLON WASTE OIL TANK <br />' LABORATORY TO COLLECT <br /> AND TEST SAMPLES: EUREKA LABORATORIES, INC. <br /> 3401 LA GRANDE BLVD. <br /> SACRAMENTO, CA 95823 <br /> (916) 428-1193 <br /> (METHOD FOR DISPOSAL <br /> OF RESIDUALS: TANK WILL BE PUMPED OUT BY RAMOS OIL CO. , T,,-,IC <br /> 1515 SOUTH RIVER ROAD, WEST SACRAMENTO, CA (916) <br /> 371-2570. CROSBY AND 0VERTON, 8430 AMELIA STREET, <br /> a OAKLAND, CA 94621" (415)633-0336, WILL CLEAN THE <br /> TANK AND TRANSPORT RESIDUE MATERIAL TO THEIR <br /> FACILITY FOR DISPOSAL. THE EXISTING DRAIN AND VENT <br /> 9 LINES WILL BE CAPPED AND ABANDONED IN PLACE. <br /> METHOD OF REMOVAL: A BACKHOE WILL BE USED TO EXCAVATE THE TANK HOLE <br /> LOCATION AND LIFT THE TANK FROM THE HOLE. <br /> METHOD OF DISPOSAL <br /> OF TANK: TANK WILL BE TRANSPORTED (VIA TRUCK) TO TRIANGLE <br /> INC, OF SACRAMENTO, 3525 — 52ND AVt. , SACRAMENTO, <br /> CA 95823 (916)421-199`0, WHO WILL BE RESPONSIBLE FOR <br /> DISMANTLING AND DISPOSING OF THE TANK AS SCRAP <br /> METAL. <br /> WASTE OIL: SOIL TEST WILL BE PERFORMED FOR THE FOLLOWING: <br /> SAMPLES OF SOIL IN THE HASTE OIL PIT ARE TO BE <br /> SAMPLED FOR THE FOLLOWING CONSTITUENTS: <br /> E TOTAL PETROLEUM HYDROCARBONS (METHOD 8010 OR <br /> EQUIVALENT AS MEASURED AGAINST _THE APPROPRIATE <br /> STANDARD [E.G. GAS, DIESEL] ) ; BTX (METHOD 8020) ; <br /> PCB (METHOD 8080); METALS (ATOMIC ABSORPTION <br /> SPECTRA) ; PH; PNA (METHOD 8100) ; AND DIOXIN <br /> I DLBENZOFURA S. <br /> APR 2n € 87 <br /> PND6130/8710604/wes <br /> ENVIROMENTAL HEALTH <br /> FERMIT/SERVICES, <br />