Laserfiche WebLink
11. Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: City Of Stockton <br /> b. Sewage Disposal : Septic Tank &Leach field <br /> C . Storm Drainage: None <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : <br /> d. Natural Gas : P,G &E <br /> e . Electricity: <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> Private Roadway from Lincoln Road <br /> g . Fire:(,Dr6anDistance to nearest fire station: 2 rni B <br /> h . Schools • Li co n Sr. High School ( LliSD) <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> N/A <br /> Types of emissions and sources associated with project <br /> N/A <br /> Fuel sources (and aipounts ) to be consumed by or as a result of the <br /> completed project N/A <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> None <br /> Irrigated Not irrigated <br /> Minor Subdivision - 9 - ( 6/86 ) <br />