My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004060
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LAMMERS
>
24100
>
2900 - Site Mitigation Program
>
PR0508110
>
ARCHIVED REPORTS_XR0004060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:56:39 PM
Creation date
2/13/2020 9:56:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004060
RECORD_ID
PR0508110
PE
2950
FACILITY_ID
FA0006134
FACILITY_NAME
POMBO RANCH
STREET_NUMBER
24100
Direction
S
STREET_NAME
LAMMERS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
24002002
CURRENT_STATUS
01
SITE_LOCATION
24100 S LAMMERS RD
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pombo Ranch Facility May 2006 <br /> Site Closure Report <br /> 1 <br /> . for a removal efficiency of approximately 97.47 per cent. Post excavation benzene <br /> ' contamination is shown in Figure 12. <br /> Toluene hot spots were located in the southeast portion of the excavation in the vicinity <br /> ' of boring B-3 and in the eastern portion of excavation in the vicinity of MW4 and boring <br /> B-11 as shown in Figure 13. North — south and east- west cross sections showing the <br /> extent of the toluene contamination are shown in Figure 14 and Figure 15. Approximately <br /> 1.20 pounds of toluene was removed by the remedial excavation. Residual toluene <br /> ' contamination was detected in the confirmation soil sample in the eastern sidewall. An <br /> estimated 0.016 pounds of residual toluene contamination is present in the eastern side of <br /> ' the excavation for a removal efficiency of approximately 99.68 per cent. Post excavation <br /> toluene contamination is shown in Figure 16. <br /> ' Ethyl benzene hot spots were located in the southeast portion of the excavation in the <br /> vicinity of boring B-3 and in the northeastern portion of excavation in the vicinity of <br /> MW4 and boring B-1 1 as shown in Figure 17. North— south and east- west cross sections <br /> ' showing the extent of the ethyl benzene contamination are shown in Figure 18 and Figure <br /> 19. Approximately 3.13 pounds of ethyl benzene was removed by the remedial <br /> excavation. Residual ethyl benzene contamination was detected in the confirmation soil <br /> ' sample in the eastern sidewall. An estimated 0.021 pounds of residual ethyl benzene <br /> contamination is present in the eastern side of the excavation for a removal efficiency of <br /> approximately 99.33 per cent. Post excavation ethyl benzene contamination is shown in <br /> Figure 20. <br /> Xylene hot spots were located in the southeast portion of the excavation in the vicinity of <br /> boring B-3 and in the northeastern portion of excavation in the vicinity of MW4 and <br /> boring B-11 as shown in Figure 21. North — south and cast- west cross sections showing <br /> the extent of the xylene contamination are shown in Figure 22 and Figure 23. <br /> ' Approximately 4.13 pounds of xylene was removed by the remedial excavation. Residual <br /> xylene contamination was detected in the confirmation soil sample in the western and <br /> eastern sidewalls. An estimated 0.041 pounds of residual xylene contamination is present <br /> ' predominantly in the eastern side of the excavation for a removal efficiency of <br /> approximately 99.02 per cent. Post excavation xylene contamination is shown in Figure <br /> ' 24. <br /> Gasoline petroleum hydrocarbon hot spots were located in the southeast portion of the <br /> ' excavation in the vicinity of boring B-3 and in the northeastern portion of excavation in <br /> the vicinity of MW4 and boring B-11 as shown in Figure 25. North---south and east- west <br /> cross sections showing the extent of the xylene contamination are shown in Figure 26 and <br /> Figure 27. Approximately 211.56 pounds of gasoline was removed by the remedial <br /> excavation. Residual gasoline contamination was not detected in the confirmation soil <br /> samples in the excavation sidewalls. Post excavation gasoline contamination is shown in <br /> ' Figure 28. <br /> A MTBE hot spot was located in the southeast portion of the excavation in the vicinity of <br /> ' boring B-3 as shown in Figure 29. North — south and east- west cross sections showing <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.