My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
3000 – Underground Injection Control Program
>
PR0515446
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 2:29:48 PM
Creation date
2/13/2020 11:26:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515446
PE
3030
FACILITY_ID
FA0012150
FACILITY_NAME
NAVAL COMPUTER TELECOMMUNICATIONS
STREET_NUMBER
305
STREET_NAME
FYFFE
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
305 FYFFE AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGS, Inc. <br /> Consulting Engineers <br /> September 20, 1999 <br /> Mr. AI Jesena <br /> Department of the Navy <br /> Engineering Field Activities, West <br /> Naval Facilities Engineering Command <br /> 900 Commodore Drive <br /> San Bruno, CA 94066-2402 <br /> Re: Schedule for Buildings 12, 410C, and 508 Oil Water Separator Investigation <br /> Naval Computer and Telecommunications Station <br /> San Diego Detachment <br /> Stockton, CA <br /> AGS project No. 950304P <br /> Dear Mr. Jesena: <br /> As you requested, AGS Inc. (AGS) is providing a schedule and brief description of <br /> investigation activities proposed at the Naval Computer and Telecommunications Station <br /> San Diego Detachment (NCTS). The site work is anticipated to take four days beginning <br /> on September 28, 1999. Site activities will be conducted during daylight hours from <br /> approximately 8.00 am to 5:00 pm. Field activities will be coordinated between NCTS <br /> environmental oversight personnel, the EFA-West project manager and AGS prior to the <br /> beginning of the field work. <br /> Scope of Work <br /> AGS proposes to drill 21 soil borings at the three sites. The drilling locations will be <br /> cleared using a utility subcontractor prior to the drilling activities. Drill cuttings and <br /> decontamination water will be stored on-site in properly labeled DOT approved 55-gallon <br /> drums prior to their removal (approximately 8 weeks). AGS will arrange for the proper <br /> disposal of the drums. The following table presents the proposed schedule for the field <br /> activities. <br /> 1 1 1 New Montacmerj. Suite 500. Sar. =raresco, CA 941 C: 0 ?hone (415i 777-2 1 66 0 :ax(415) 777-4874 <br />
The URL can be used to link to this page
Your browser does not support the video tag.