My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
SITE INFORMATION AND CORRESPONDENCE_FILE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:19:43 PM
Creation date
2/13/2020 11:48:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 1
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRONTIER TRANSPORTATION, INC. <br /> Page 2 <br /> 1 . help the responsible party undertake the necessary corrective action in a cost-effective, <br /> efficient and timely manner; <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective <br /> action alternative before any corrective action work was performed; and <br /> 3 . ensure the Fund will only reimburse the most cost-effective corrective action alternative <br /> required by the regulatory agency to achieve the minimum cleanup necessary to protect <br /> human health, safety and the environment. <br /> In some limited situations interim cleanup will be necessary to mitigate a demonstrated <br /> immediate hazard to public health, or the environment. Program regulations allow the <br /> responsible party to undertake interim remedial action after: ( 1) notifying the regulatory agency <br /> of the proposed action, and; (2) complying with any requirements that the regulatory agency may <br /> set. Interim remedial action should only be proposed when necessary to mitigate an immediate <br /> demonstrated hazard. Implementing interim remedial action does not eliminate the <br /> requirement for a CAP and an evaluation of the most cost-effective corrective action <br /> alternative. <br /> Three bids and Cost Preap rp oval: Only corrective action costs required by the regulatory <br /> agency to protect human health, safety and the environment can be claimed for reimbursement. <br /> You must comply with all regulatory agency time schedules and requirements and you must <br /> obtain three bids for any required corrective action. Unless waived in writing, you are required <br /> to obtain preapproval of costs for all future corrective action work Ifyou do not obtain three <br /> bids and cost preapprovalr reimbursement is not assured and costs may be rejected as <br /> ineligible. <br /> If you have any questions, please contact Pamela Rarick at (916) 227-2784. <br /> Sincerely, <br /> Dave Deaner; Manager <br /> Underground Storage Tank Cleanup Fund <br /> 7?�. ♦ Recycled Paper Our mission is to preserve and enhance the quality of California 's water resources, and <br /> '� p ensure their proper allocation and efficient use far the benefit ofpresent andfuture generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.