Laserfiche WebLink
J <br /> Remedial Action Plan RE: 425 W. Larch Street, Tracy, CA <br /> October 1 , 2008 W&A Project No. FTIM-08-001 <br /> Page 10 of 11 <br /> If chemical oxidation via O3 sparging were to be implemented, the cost for design, permitting, <br /> well installation, construction and installation, operation and maintenance, and continued <br /> quarterly monitoring/sampling/reporting is estimated to be approximately $500,000. <br /> 6 REMEDIAL APPROACH <br /> Given that DPE and Ozone injection appear to be most cost effective alternatives, further <br /> evaluation of these two remedial alternatives is recommended. In order to assess the <br /> effectiveness of ozone injection and identify if unwanted reactions (i.e. hexa4n,bant chromium <br /> mobilization) might occur, we recommend conducting a bench scale test and a pilot study. <br /> W&A proposes installation of one ozone injection well to collect necessary samples to conduct <br /> the ozone injection test. The ozone injection well can also be used during the pilot study. To <br /> evaluate the viability of DPE remediation at the site and to gather data (individual well vapor and <br /> groundwater flow rates, influent vapor concentrations, induced vacuum, drawdown of the water <br /> table in nearby wells, etc.) to assist in the development of an appropriate engineering design for <br /> the full-scale DPE system, W&A proposes the performance of a 8- 12 hour DPE pilot test at the <br /> site. Details associated with the ozone injection bench scale test and DPE and ozone injection <br /> pilot studies will be presented in a separate Work Plan <br /> 7 REFERENCES <br /> Blakely Environmental Investigations, Inc., Report of Findings, March 3, 2000 <br /> Blakely Environmental Investigations, Inc., Report of Findings, September 5 , 2002 <br /> Blakely Environmental Investigations, Inc., Report of Findings, August 26, 2003 <br /> Biophysics Environmental Assessments, Inc., Report of Findings of Monitoring Well <br /> Installation, August 31 , 2005 <br /> Biophysics Environmental Assessments, Inc., Interim Corrective Action Plan, December 20, <br /> 2005 <br /> Biophysics Environmental Assessments, Inc., Addendum to Interim Corrective Action Plan, <br /> April 147 2006 <br /> Biophysics Environmental Assessments, Inc., 2008 2nd Quarter Groundwater Monitoring Report, <br /> August 21 , 2008 <br /> Biophysics Environmental Assessments, Inc. , Well Installation Work Plan, July 30, 2008 <br /> Biophysics Environmental Assessments, Inc., Aquifer Pump Test, November 8, 2006 <br /> San Joaquin County, Environmental Health Department, Letter Plan, May 21 , 2008 <br /> San Joaquin County, Environmental Health Department, Letter Plan, June 30, 2008 <br /> San Joaquin County, Environmental Health Department, Letter Plan, August 29, 2008 <br /> IW WINEFIEW E N550CIFTM INC. <br /> .n.0 N.i.N. .Ne .re+. u.su TA%T$ <br />