Addendum to Interim Corrective Action Plan <br /> r Frontier Transportation, Inc. <br /> April 14, 2006 <br /> Page 6 <br /> If pit samples identify elevated contamination on the eastern and western walls of <br /> the excavation pit, a second stage of excavation will be implemented. Trenched - - <br /> measuring from 18" up to 24" in width will be excavated to 20' bgs to remove <br /> contaminated soil that is closer to the sidewalk and steel building. The fine-grained soils <br /> ff 1 identified in the subsurface at the site should support trenching to the required depth of <br /> 15 ' bgs to 20' bgs, depending upon the soil sample results. Should caving begin during <br /> this part of the excavation, the trenches will be backfilled with clean backfill material. <br /> i1 <br /> BEA proposes that the impacted soil be excavated and removed by ramping and <br /> excavation to 1 ' above the groundwater table at 13 ' bgs and removal of the free phase <br /> gasoline and soil to 20 ' bgs by a tracked backhoe or by a clamshell apparatus. Since the <br /> water-bearing horizon extends vertically from 13 ' to 20' bgs that soil horizon is <br /> principally saturated sand, caving is anticipated and removal by clamshell may be <br /> recommended. <br /> r D. Aquifer Testing and Groundwater Extraction <br /> BEA proposes aquifer testing at the site to facilitate implementation of a <br /> groundwater pumping and treatment system that will attempt to contain continuing down <br /> ` gradient and potential off-site migration of the dissolved plume. BEA proposes that <br /> groundwater pumping be performed in two separate events in two groundwater areas : one <br /> f l at the down-gradient area of the dissolved plume, near MW-9, to act as containment of <br /> further migration, the second pumping to be performed north of the apparent source at <br /> MW-8, near recently identified free floating product in MW-2 and MW-21 . MW-8 was <br /> chosen based upon its proximity to the source area and wells with floating free product. <br /> AQUIFER TEST SPECIFICATIONS <br /> lIn addition, BEA proposes that groundwater pump and treatment feasibility <br /> testing be completed by aquifer testing. Two additional groundwater wells will be =1 e> t nl' d <br /> advanced to 20 ' below grade surface (bgs) as confirmation wells for each of the two <br /> pumping wells. Shallow subsurface dewatering will be identified at 10' and 20 ' intervals <br /> from existing wells MW-8 and MW-9. See Figure 2 for the locations of the additional <br /> i wells for the aquifer tests at MW-8 and MW-9. <br /> In addition, selected soil samples from each well will be collected within the <br /> saturated zone of the perched groundwater to obtain physical parameters from this zone. <br /> J These soil samples will be analyzed for permeability, moisture content, dry density, <br /> specific gravity, porosity, and total organic carbon (TOC) using ASTM D-2434 and <br /> Walkely-Black method for TOC. <br /> 6 <br /> i <br />