Laserfiche WebLink
SEP - 27 - 04 03 : 53 PM EF INC . 760 y-.--.. 8 8572 Pm02 <br /> r.� Glean Soils , Inc . <br /> 4359 Phelan Rvadt Phal ^ CA 42371 <br /> Phnne: 760168-8572 FoK: 760-868-8573 <br /> September 21 , 2004 <br /> Ms. Vicki McCartney <br /> Environmental Health Department, San Joaquin County <br /> 304 East Weber Avenue, 3`d Floor <br /> Stockton, California 95202=2708 <br /> Subject ; Addendum to Remedial Action Plan for Frontier Transportation Property located <br /> at 425 Larch Road, Tracy, California . <br /> Based on our conversations, Clean Soils, Inc. (CSI) submits the following changes to the <br /> Remedial Action Plan (RAP) dated June 17, 2004, These changes decrease the scope of <br /> work of the plan to expedite removal of the free phase gasoline source identified at A4' <br /> below grade surface (bgs) and 4' beneath the first water table. Removal of the significant <br /> free phase source will provide containment of the plume. The plume has migrated <br /> extensively and advectively in free phase, dissolved phase and vapor phase above, <br /> beneath and dissolved in the first groundwater. <br /> It is proposed that the Remedial Action Plan be limited to the following scope of work to <br /> provide necessary containment of the significantly expanding gasoline and MTBE plume. <br /> This expansion of the plume now identified at 260' west and hydraulically down gradient <br /> of the source identified 4 ' beneath the first groundwater in the excavation identified <br /> gasoline product concentrations well in the free phase range (TPH -gasoline at 2, 500 <br /> parts per million (ppm), BTEX at 1 ,307 ppm, and MTBE 26 at ppm). CSI shares the <br /> concerns expressed by Environmental Health Department staff that migration is ongoing <br /> in multiple permeable channels in the heterogeneous clayey soil. <br /> CSI proposes that excavation be performed expeditiously in the excavation source area <br /> intersected by monitoring well MW-3R. During excavation in May 2002 free phase <br /> (LNAPL) concentrations (greater than 200 parts per million) were identified at 14 ' bgs <br /> under a site wide first groundwater table at 10 ' bgs. This would effectively remove the <br /> free phase source inverted under first groundwater traveling westward under the pre- <br /> fabricated, steel, mechanic shop building at concentrations that would indicate free phase . <br /> (LNAPL) as well as dissolved and highly adsorbed gasoline, gasoline aromatic <br /> constituents and the oxygenate MTBE . Sample results tabulated in the June 2004 RAP <br /> indicate extensive lateral and unknown vertical migration of the MTBE. Excavation of <br /> the inverted LNAPL soils contamination beneath first groundwater the re-excavated tank <br /> removal area in its entirety must be performed. This addendum further proposes that <br /> water and soil vapor treatment be postponed until the extent of oxygenate NME and <br /> gasoline and aromatic constituent contamination is identified. <br />