Laserfiche WebLink
I <br /> HEALTH AND SAFETY PLAN <br /> Blakely Environmental Investigations, Inc. (BEII), has established this site-specific Health and Safety Plan <br /> j> (HASP) as part of he work plan for all individuals engaged in field assessment or any other on-site activities at the <br /> Frontier Transportation property located at 425 Larch Road, Tracy, CA. The plan was developed in accordance with <br /> Title 8 of the California Code of Regulations (8 CCR). All site work shall be conducted in a safe manner and <br /> comply with EPA, state and local regulations, in particular OSHA 29 CFR, part 1910, the National Contingency <br /> Plan, and Title 8 of the Health and Safety Code. In addition, all site work will comply with BEII Corporate Health <br /> and Safety Program and all supporting Standard Operating Procedures. This HASP may be modified during actual <br /> field activities, if necessary, as more information and site-specific data is obtained. <br /> Prior to any work on-site, an approved copy of this HASP (latest edition) shall be provided to all employees <br /> and subcontractors by the Project Manager. Each subcontractor will be responsible for providing their own HASP. <br /> ! ' At a minimum the subcontractors' HASP must meet the requirements of this HASP. Each subcontractor not covered <br /> by the BEII HASP must submit their own HASP to the DTSC for review prior to initiation of field work. <br /> 1 .1 PURPOSE AND OBJECTIVES <br /> The purpose of this site-specific HASP is to provide guidelines and procedures to ensure the health and <br /> physical safety of those persons working at the Frontier Transportation property. While it may be impossible to <br /> eliminate all risks associated with site work, the goal is to provide precautionary and responsive measures for the <br /> protection of on-site personnel, the general public and the environment. <br /> The HASP objectives are as follows: <br /> i <br /> * Ensure the safety of all site personnel <br /> * Protect the public and the environment <br /> * Adhere to BEH Health and Safety procedures <br /> 1.2 IMPLEMENTATION <br /> This site-specific HASP, and any additions included in a subcontractor HASP, will be reviewed and the <br /> Field Team Review Form (Attachment 1) will be completed by all site personnel prior to their scheduled field work. <br /> Whenever the site-specific HASP is revised or amended, personnel will be instructed in the new procedures and <br /> required to complete a new Field Team Review Form. The site-specific HASP will be implemented in the field by <br /> BE11's Health and Safety Coordinator and/or designated Site Safety Officer. <br /> 2.0 BACKGROUND <br /> 2.1 SITE LOCATION AND DESCRIPTION <br /> i- <br /> The site is located at 425 Larch Road in the city of Tracy. The site consists of a trucking facility with one <br /> metal frame building and all parking and work areas capped by cement and/or asphalt. The site is located in an <br /> z <br /> industrial park. <br /> 2.2 SCOPE OF WORK <br /> Excavate impacted soil and groundwater pump and treat remedial activities. . <br /> G <br /> C <br />