My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 9:23:48 AM
Creation date
2/13/2020 11:58:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
GAVINKO PETROLEUM*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c � <br /> SAN0 A Q U I N S Enviro enta ealt a � rti nt <br /> -- COUNTY -- , REUt VED <br /> UST SYSTEM RETROFIT OR REPAIR NOV ) 8 2019 <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [ ] NO [ ] ENVIRONMENTAL HEALTH <br /> DFPARTMENT <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the " Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and/or replacements . If repairing a component, describe <br /> how this will be done . ( If adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade, <br /> use the UST Installation Application pages 4- 8 as necessary for a timely plan review) : <br /> Remove and replace 87 / 91 fill sump electrical fittings from rubber to bonded <br /> Fiberglass . Pressure test with EHD present. Upon completion of test , place Brine solution <br /> in sumps with present . Install 3 new OPW overspill containers . <br /> 4. . List of equipment to be used (Attach manufacturer' s specification sheets showing third-party approval) : <br /> Bravo FmW7 RETROFIT-SD -AB Fiberglass Entry Fittings <br /> Xerxes Calcium Chloride <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES [ ] NO [ ] <br /> b . Identify contractor performing decontamination : <br /> Name Phone (..j <br /> Address City Zip <br /> 3of6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.