My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MORELAND
>
7700
>
2300 - Underground Storage Tank Program
>
PR0231819
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2022 9:23:48 AM
Creation date
2/13/2020 11:58:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231819
PE
2351
FACILITY_ID
FA0003732
FACILITY_NAME
GAVINKO PETROLEUM*
STREET_NUMBER
7700
STREET_NAME
MORELAND
STREET_TYPE
ST
City
STOCKTON
Zip
95212
APN
13003010
CURRENT_STATUS
01
SITE_LOCATION
7700 MORELAND ST
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW 7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB-certified OPW 71 SO Storage Tank(UST),properly <br /> Float: Nitrile rubber,closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve <br /> Valve:Aluminum i and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential. <br /> underground storage tanks by providing Seals:Viton" Delivery personnel should <br /> a positive shut-off of product delivery. Upper& lower Drop Tube:Aluminum be managed and trainedto inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts:Acetal and hoses for damaged and <br /> the drop tube used for gravity filling. p missing parts.They should <br /> The OPW 71 SO allows easy installation Hardware: Stainless steel �ql;U always make certain there <br /> y L'. 4 < is a positive connection <br /> (without breaking concrete) and requires <br /> Features %c'e between the adaptor and <br /> �, elbow.If delivery equipment <br /> no special manholes. s Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation—no excavation or or the elbow is not securely <br /> a shut-off valve.When the liquid at. coupled to the adaptor,a <br /> sta <br /> 9 q special manholes required. serious spill may result when <br /> level rises to about 95% of tank ♦ Economical—costs a fraction the OPW 71 SO closes,causing <br /> capacity,the valve mechanism is of complicated and a hazard and environmental <br /> exp ensive, <br /> released,closing automatically with - contamination. <br /> the flow.This reduces the flow rate to difficult-to-install valves. <br /> approximately 5 gpm through a bypass ♦ Furnished Complete—supplied t NOTE:The DPW 71 SO is <br /> valve.The operator may then stop the with new upper and lower drop tubes, designed for use tight-fill <br /> gravity drop applicis tight-fill <br /> only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose.As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95% level,the valve will ® Completely Automatic Operation <br /> close automatically each time delivery —no prechecks to perform, no resets Retrofits Directly—for both new <br /> is attempted. and no overrides to be broken and existing tanks with 4" fill risers. <br /> If the delivery is not stopped and the or abused. ® Quick Drain Feature— <br /> liquid rises to about 98% of tank + No Pressurization of the Tank— automatically drains hose when head <br /> capacity,the bypass valve closes operates directly from liquid level. pressure is relieved. <br /> completely.No additional liquid can flow Will Accept a Dipstick ® Best Flow Rate in The Industry* <br /> into the tank until the level drops below <br /> for Gauging <br /> a reset point. •OPW Test Lab results <br /> NOTE:The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity.Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation—does not rely on the spill risk. <br /> determine the regulatory requirements alertness orspeed of response of the <br /> governing shut-off capacity in your p � Speeds Delivery Operations <br /> region,as well o take into account delivery attendant for certainty of —product flows unimpeded into <br /> other considerations such as extreme overfill prevention. the tank until the hose "kick"that <br /> tank tilt.In all cases, the upper tube Keeps the Top of UST"Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements— provides a clear signal that the <br /> 6 112" to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level. <br /> off flow into the tank completely before bung fittings and the need for o Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation—in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow—allowing additional.excavation, manholes or <br /> 71 SO Instruction Sheet Order vent pipin Cid. ._, <br /> Number: H15524PA `�.d' <br /> V ED' <br /> E Look for this label for <br /> � <br /> Listings and = /+ .bwtMc.r, . authentic OPW EVR h!91V — <br /> 3 2019 <br /> Approved products.. <br /> rnia Air <br /> Certifications BmuCalifces BoardC� ���� OPW 7150 is EVR Approved for E85 <br /> car>wa <br /> �N,a <br /> 104 O P W Z> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.