My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004261
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LARCH
>
425
>
2900 - Site Mitigation Program
>
PR0541913
>
ARCHIVED REPORTS_XR0004261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2020 11:39:32 PM
Creation date
2/13/2020 1:25:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004261
RECORD_ID
PR0541913
PE
2960
FACILITY_ID
FA0024043
FACILITY_NAME
FRONTIER TRANSPORTATION FACILITY
STREET_NUMBER
425
STREET_NAME
LARCH
STREET_TYPE
RD
City
TRACY
Zip
95304
APN
21220009
CURRENT_STATUS
01
SITE_LOCATION
425 LARCH RD
P_LOCATION
03
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Report of Findings <br /> Frontier Transportation <br />' 03-28-98 <br /> March 28, 1998 <br />' 1.0) INTRODUCTION <br /> Blakely Environmental Investigations, Inc. (BEI, Inc.) was contracted by Frontier <br />' Transportation, Inc. ((909) 590-8200) to assess the degree of petroleum impacted soil and <br /> groundwater encountered after removal of underground fuel storage tanks at the Frontier <br /> Transportation facility, 425 Larch Road, Tracy, CA(See Figure 1, Site Location Map). <br />' Investigative work began in January of 1998. This report of findings reviews the site investigation <br /> work performed by BEI, Inc. as requested by the San Joaquin County Public Health Services, <br />' Environmental Health Division (PHS/EHD), Mr. Steven Sasson. <br /> 2.0) SITE LOCATION AND HISTORY <br />' The site is located in Tracy California at 425 Larch Road in the northwest quarter of <br /> section 16, Township 2 South, Range 5 East, Mount Diablo Baseline at Meridian. The site <br />' consists of a trucking facility with one metal framed building and all parking and work areas <br /> capped by cement and/or asphalt. The site is located in an industrial park. <br /> Six (6) underground fuel storage tanks (USTs), three diesel tanks located northeast of the <br /> terminal and three gasoline tanks located southeast of the terminal, were removed from the site on <br /> July 21, 1995. Four (4) soil samples (S-1-W, S-1-E, S-2, and S-3) were collected from the <br />' gasoline tank excavation pit, eleven (11) soil samples (T4-1 through T6-3) were collected from <br /> the diesel excavation pit, and three (3) groundwater samples (WS-West, WS-Center, and <br /> WS-East) were collected from the diesel excavation pit (See Figure 2, Soil Sample Locations). <br />' Laboratory analytical results are presented in Table 1. <br /> Table 1: 1995 UST Removal Sample Results <br />' Sample ID Depth B T E X TPH-g TPH-d <br /> S-1-W 8.5' 46 360 120 720 7,200 110 <br /> s-1-E 8.5' 84 460 120 690 9,800 120 <br />' S-2 7.5' 47 320 110 620 4,700 92 <br /> S-3 8.5' j 47 320 100 540 6,000 61 <br /> T4-1 13 ND ND ND ND NA ND <br /> T4-2 13 ND ND ND ND NA ND <br />' T4-3 13 ND ND j ND ND NA ND <br /> • 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.