Laserfiche WebLink
' DEL-TECH GEOTECHNICAL SUPPORT SERVICES <br />' MONITORING WELL FIELD LOG 2002 <br /> SAMPLE LOCATION/ MW - 5 DATE: 1/17/2003 <br /> PROJECT NAME- FRONTIER TRUCKING ANALYSIS PERFORMED: SEE CHAIN OF CUSTODY <br /> ADDRESS. LARCH ROAD SAMPLE TIME 1326 <br /> CITY,STATE• TRACY, CA SAMPLE CONTAINERS- 4 V O A'S& I LITRE <br /> SITE CONTACT- PRESERVATIVES HCL <br /> CONSULTANT BLAKELY ENVIRONMENTAL LAB ANALYSIS BY SHERWOOD LABS <br />' PROJECT MANAGER HIRAM MONUMENT ] FLUSH <br /> SAMPLER DEL-TECH WELL CASING MATERIAL PVC <br /> SIGNED WELL CASING DIA 2" / 0 1632 <br /> SAMPLE MEDIA GROUNDWATER P I D READING/ODOR: ` N/A NONE <br />' TOP OF CASING ELEVAIWN MSL COLOR CLEAR <br /> DEPTH TO WATER. feet 100th's 941 FEET CALC PURGE VOL 1 48 GAL <br /> DEPTH OF WELL feet.100th's 1848 FEET TOTAL VOLUME PURGED 45 GAL <br />' STANDING WATER COLUMN 907 FEET DEPTH OF PUMP TUBING FEET <br /> FIELD PARAMETERS <br /> • TIME CUMULATIVE DRAW PUMPING PH E C ITEMP ORP. DISSOLVED TURBIDITY <br /> CASING VOLUME DOWN RATE OXYGEN COLOR <br /> PER PURGE (D T W) (GPM/LPM) (units) (MsMH05) (Celsius) (Mvolts) (PPM) (N T U) <br /> 0 N/A 5 GPM 737 3234 209 603 070 CLEAR <br /> 15 ir736 3152 209 612 066 " <br />' 3 „ 730 3134 210 595 053 " <br /> 45 736 3127 210 59 050 it <br />' PURGE METHOD ISCO PERISTALTIC PUMP <br /> SAMPLE METHOD ISCO PERISTALTIC PUMP <br /> D T W AFTER PURGE D T W AT SAMPLE TIME 1190, <br /> WELL INTEGRITY CAP&SEAL ARE SECURE <br /> WELL LOCATION SEE SITE MAP <br /> REMARKS <br /> WEATHER OVERCAST SKIES WIND <br /> QUALITY CONTROL ALL PURGING E UIPMENTAND SAMPLING EQUIPMENT WAS CLEANED IN THE <br /> FIELD WITH A STEAMCLEANER&ALCONOX SOAP NEW NITRILE GLOVES <br /> CONTAINMENT D O T 17 55 GAL STEEL DRUM OR 60 GAL POLY DRUM <br /> INSTRUMENTATION Y S 1 556 MULTIPROBE Y S I DISSOLVED OXYGEN METER <br /> SOLINIST SLOPE METER THERMODINE 580B P I D <br /> KECK INTERFACE METER TURBIDITY METER <br /> qwI <br />