Laserfiche WebLink
WallaceKuhl <br /> GROUNDWATER PURGE AND SAMPLE DATA NN A 5 0 C I A E S I N <br /> Job Name: Morton Operable Unit <br /> Job#: 6278.03 Date: February 5, 2007 <br /> Well ID: 2AMW-15 Personnel: �3 <br /> , Gauging Data <br /> Measuring Equipment: WLM P <br /> 1 Measuring Reference Poin scription: TOC Well Cap Pressurized: Yes No <br /> Total Depth Depth to Water Column Casing Diameter Casing Volume CasingTotal Purge <br /> Well Purge (feet) Water(feet) (feet) Multiplier (gal) Volumes to Volume(gal) <br /> Volume Purge <br /> Calculation �{ f� _ 3/4 2 4 6 _ �/ _ `� c� <br /> 31.85 V Cl- d� x 0.023 0.163 0.653 1.46 `` / �>,_3 (� 1 <br /> Purging Data <br /> Purge Method: Bailer Sub si le Pu bot Valve / Other(Specify): <br /> Multi-parameter Meter Used: ann / YSI 556 / Horiba U-22 / Other(Specify): <br /> ' <br /> Time Volume H emp Conductivity TDS Turbidity/ <br /> Purge(gal) (deg C) p (µs/cm) (ppm) Color <br /> cL� 3 Zv. -4 ( i ( Z 61)L <br /> I-) C, 6 0� r(-C.-A- <br /> 1 <br /> Product Sheen Yes C '� Dewatered Yes CNo' <br /> Petroleum Hydrocarbon Odor (9> No <br /> Comments: <br /> Sample Data Well Condition Weather Conditions: <br /> Sample Time: f Z Well Box O Not OK �o <br /> Number o <br /> Container Type Containers Preservative Well Box Lid Not OK Problems Encountered: <br /> VOA 6 HCL Bolts tj lP- OK Not OK <br /> Poly 1 None Casing Cap O Not OK <br /> ' 1 L Amber 2 Na2S203 Lock ('(4ll� & Not OK <br /> LDPE Tubing Not OK <br /> Grout O Not OK <br />