My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL INVESTIGATION REPORT 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_REMEDIAL INVESTIGATION REPORT 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:47:33 PM
Creation date
2/13/2020 2:23:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL INVESTIGATION REPORT 2000
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
808
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Dates and times of collection <br /> - Purpose of sample <br /> Sample distribution (e.g. , laboratory, archive, etc.) <br /> Field observations <br /> Field measurements (e.g. , PID readings, pH, <br /> conductivity, water levels) . <br /> Other data records (e.g. development log, soil sampling <br /> report, well log, etc. ) <br /> All drilling equipment, pipe, and materials coming in <br /> contact with the borehole material will be decontaminated <br /> before use according to the procedures described in Section <br /> 6. 0. All sampling equipment will be decontaminated prior to <br /> sampling following these same procedures. <br /> Soil samples will be collected as monitoring well drilling <br /> progresses . All downhole drilling equipment will be <br /> decontaminated prior to use and between use for each well <br /> according to the procedures described in Section 4.0. <br /> All well construction material, including well casing, <br /> screen, and well caps , will be decontaminated prior to <br /> installation by steam cleaning according to the procedures <br /> described in Section 4.0. <br /> To prevent the transfer of surface contabination to a well, <br /> a Portland cement and bentonite surface seal will be <br /> installed in conformance with regulatory requirements. The <br /> casing will be fitted with a water tight locking cap. No <br /> solvent or glue will be used in well construction. The <br /> wellhead will be contained below grade in a water-tight. <br /> traffic rated box or otherwise protected from damage. <br /> In order to assure that groundwater samples are obtained <br /> from formation material and not from the filter pack, wells <br /> will be purged in accordance with the appended <br /> Well Development Protocol. <br /> Samples will be placed in laboratory prepared containers, <br /> appropriate for the analyses specified as indicated on Table <br /> 1. <br /> Amber glass and polyethylene bottles will be filled to the <br /> bottle neck. Samples collected in 40-m1 VOA vials will be <br /> filled to overflowing with a positive meniscus. The vials <br /> will be sealed with a teflon-lined screw cap such that no <br /> head space exists within the vial. <br />
The URL can be used to link to this page
Your browser does not support the video tag.