Laserfiche WebLink
Table 2 <br /> Monitoring Well Construction Details <br /> South Shore Parcels-Parcel 2A and Adjacent Areas <br /> West Weber Avenue and North Lincoln Street <br /> Stockton,California <br /> Well Ground Filter Filter Ben- Ben- <br /> Coordinates PVC Box Surface Well Screen Screen Pack Pack tonite tonite <br /> WellLatitude Longitude Date Elevation Elevation Elevation Depth Diameter Top Bottom Length Top Top Top Top Comments <br /> I.D. Installed (feet,MSL) (feet,MSL) (feet,MSL) (feet,bgs) (feet,MSL) (inches) (feet,bgs) (feet,MSL)I(feet,bgs) I(feet,MSL) (feet) (feet,bgs) (feet,MSL) (feet,bgs) feet,MSL) <br /> Geoprobe Details <br /> GP-1 37.9527404 -121.3000964 04/09/05 NA NA 11.75 55 -43.25 NA NA NA NA NA NA NA NA NA Geoprobe Boring <br /> GP-2 37.9524674 -121.3006304 04/10/05 NA NA 11.78 50 -38.22 NA NA NA NA NA NA NA NA NA Geoprobe Boring <br /> GP-3 37.9521109 -121.3005410 04/10/05 NA NA 11.06 55 -43.94 NA NA NA NA NA NA NA NA NA Geo robe Borin <br /> Notes: <br /> MSL= Mean Sea Level <br /> PVC=Poly Vinyl Chloride <br /> bgs=below ground surface <br /> DPE=dual phase extraction <br /> NA = Not Applicable <br /> —=Not Available <br /> *=Survey data for well 3-MW-1 in northing/easting coordinates.Well destroyed during the second quarter 2003. <br /> Wells MW-4 through MW-7 erroneously listed on boring logs as 4-inch wells. <br /> Wells resurveyed 05/23/07. <br /> Wells MW-36 and 3-MW-1R were destroyed by Clayton on April 5,2004. <br /> Well MW-6 was destoyed by Golden State Environmental in July 2008;well MW-06R was reinstalled in close proximity to well MW-6 by Wallace Kuhl in November 2008. <br /> LLWells MW-4,MW-5,MW-8,MWA0,MWA 1,MW-39,MW-40,MW-41 and MW-53 were destroyed in November 2008 as part of the Unocal excavation activities by the City of Stockton's consultants Treadwell and Rollo. <br /> Wells MW-56 through MW-74 surveyed on 9/24/08 by Stantec;Wells MW-3,MW-6R,MW-7,MW-9,2AMW-12 through 2AMW-14,MW-15 through MW-35,MW-37,MW-38,MW-41 though MW-52,MW-54,MW-55,and DPE-1 through DPE-12 were resurveyed on 11/12/08 by Stantec;Well DP <br /> ***Well 2B-MW-1 was inaccessible during the 2008 well survey. <br /> I:\Tidewater\TW Stockton(P2A)\Tables\OMR Tables\201 1\3Q1 1\3011-Parcel2A Monitoring and Sampling Plan(Table 1 and Table 2)SPH vs.time with DPE wells.xlsx Page 5 of 5 <br />