Laserfiche WebLink
Project Number: TPE System Parcel 2A <br /> 211402841.300.400 Maintenance Data 666 West Weber Avenue <br /> Stockton, California <br /> TPE System Maintenance Checklist <br /> X Comments <br /> Change Bag Filters- <br /> Check Liquid Ring Pump Oil Level- <br /> Vacuum SPH from OWS 1 & 2 into drum and label- 6) <br /> Part B: Permit Information <br /> Verify VOC control efficiency greater than 98%- pk VOC control efficiency % _ <br /> Catalytic Mode -Verify oxidizer set point higher than 600 OF ✓ <br /> Th <br /> Verify oxidizer set point higher than 600 °F- c/ <br /> Collect influent& effluent FID reading- ✓ <br /> Download temperature data to floppy disk- <br /> Verify flow rate is < 15gpm - Flow rate = <br /> Change chart recorder paper and check pen- (record hourmeter, totalizer & date on chart) <br /> Take monthly/annual vapor/water samples- / <br /> Part C: System Data <br /> General Data - record- / <br /> Thermox Data - record thermox data- < <br /> SV Flow Data - record vapor flow data- <br /> FID Data- record FID readings- v <br /> SPH Drum Storage - record drums onsite- <br /> OWS SPH Levels - record OWS SPH levels- v <br /> Vessel Pressures - record system pressures- <br /> Site Log: Please record needed parts and maintenance conducted <br /> CompletedBy:+ Date: fid, <br />