My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Number: TPE System Parcel 2A <br /> 211402841.300.400 Maintenance Data 666 West Weber Avenue <br /> Stockton, California <br /> TPE System Maintenance Checklist <br /> X Comments <br /> Change Bag Filters- <br /> Check Liquid Ring Pump Oil Level- <br /> Vacuum SPH from OWS 1 & 2 into drum and label- 6) <br /> Part B: Permit Information <br /> Verify VOC control efficiency greater than 98%- pk VOC control efficiency % _ <br /> Catalytic Mode -Verify oxidizer set point higher than 600 OF ✓ <br /> Th <br /> Verify oxidizer set point higher than 600 °F- c/ <br /> Collect influent& effluent FID reading- ✓ <br /> Download temperature data to floppy disk- <br /> Verify flow rate is < 15gpm - Flow rate = <br /> Change chart recorder paper and check pen- (record hourmeter, totalizer & date on chart) <br /> Take monthly/annual vapor/water samples- / <br /> Part C: System Data <br /> General Data - record- / <br /> Thermox Data - record thermox data- < <br /> SV Flow Data - record vapor flow data- <br /> FID Data- record FID readings- v <br /> SPH Drum Storage - record drums onsite- <br /> OWS SPH Levels - record OWS SPH levels- v <br /> Vessel Pressures - record system pressures- <br /> Site Log: Please record needed parts and maintenance conducted <br /> CompletedBy:+ Date: fid, <br />
The URL can be used to link to this page
Your browser does not support the video tag.