My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Groundwater Monitoring and Sampling <br /> January 31, 2011 <br /> thickness from 0.01 to 3.09 ft (February 2007; Table 3). Well MW-10 was abandoned in <br /> November 2008 due to the SRDA's excavation activities. <br /> Historical measurable thickness of SPH in wells DPE-1 through DPE-13 and MW-40 has ranged <br /> from 0.01 ft (DPE-12, February 2005) to a Site-wide shallow zone maximum thickness of <br /> 11.72 ft (DPE-1, November 2003). Well MW-40 was abandoned in November 2008 due to the <br /> SRDA's excavation activities. <br /> A summary of 4Q10 SPH thickness and SPH sheen in comparison to the 3Q10 is provided in <br /> the following table. <br /> SPH removal activities are scheduled to be conducted quarterly (at a minimum) for on and off <br /> Site wells which repeatedly contain measurable thickness of SPH. It should be noted that these <br /> SPH removal activities are typically performed between quarterly monitoring events (as noted <br /> on the table), and are likely to influence reported SPH thickness. <br /> SPH SPH <br /> Well Thickness Thickness Difference <br /> Identification 3Q10 (Feet) I 4Q10 (Feet) (Feet) <br /> 2AMW-13 Sheen* Sheen* NA <br /> 2AMW-14 Sheen** Sheen NA <br /> MW-19 Sheen* Sheen* NA <br /> DPE-1 Sheen** Sheen NA <br /> DPE-2 Sheen** Sheen NA <br /> DPE-3 Sheen** Sheen NA <br /> DPE-4 Sheen** Sheen NA <br /> DPE-5 Sheen** Sheen NA <br /> DPE-6 Sheen** Sheen NA <br /> DPE-7 Sheen** Sheen NA <br /> DPE-8 Sheen** Sheen NA <br /> DPE-9 Sheen** Sheen NA <br /> DPE-10 Sheen** Sheen NA <br /> DPE-11 Sheen** Sheen NA <br /> DPE-12 Sheen** Sheen NA <br /> DPE-13 Sheen** Sheen NA <br /> Definitions: <br /> NA = Not applicable <br /> SPH = Separate phase hydrocarbon <br /> * = SPH removal occurred prior to groundwater sampling. <br /> ** = Connected to free product removals stem <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual QSSRQRSRQMR Stockton_F I NAL.doc 2.18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.