Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Groundwater Monitoring and Sampling <br /> January 31, 2011 <br /> informed that the RWQCB-CVR was developing a revised MRP for the site. Stantec inquired <br /> again by email on September 8, 2010, however, no update has been received to date. CEMC <br /> and COP look forward to receiving the draft MRP from the RWQCB-CVR for review and future <br /> implementation. <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual OSSRQRSRQMR Stockton_FINAL.doc 2.25 <br />