Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Summary of 2010 Annual Monitoring and Sampling <br /> January 31, 2011 <br /> SPH removal activities were conducted on shallow zone wells 2AMW-13 and MW-19 during all <br /> four quarters of 2010. SPH thickness appears to be stable in each of these wells following <br /> removal activities. <br /> During 2010, groundwater elevation and SPH elevations over time was analyzed in wells DPE-1 <br /> through DPE-4, DPE-6 through DPE-8, DPE-10, and DPE-12 and are presented in Appendix J. <br /> Well DPE-1 through DPE-5 and DPE-7 through DPE-13 have had a decreasing trend since <br /> monitoring began in 2002 through 2003. Measurable SPH has not been observed in wells <br /> DPE-1 through DPE-4, DPE-7, and DPE-10 through DPE-13 in the last five consecutive <br /> quarters. Well DPE-5 had decreased since August 2006 from SPH to mostly sheen, but <br /> reappeared in small quantities (up to 0.01 ft) during three consecutive quarters (4Q09, 1Q10, <br /> and 2Q10). Well DPE-6 had decreased significantly since February 2004 from SPH to mostly <br /> sheen, but reappeared in 2009 with a historical presence of 7.74 ft (2Q09). Well DPE-8 had <br /> decreased significantly since April 2008 from SPH to mostly sheen, but reappeared during three <br /> consecutive quarters, during third and fourth quarters 2009 and 1Q10. Measurable SPH has <br /> not been observed in well DPE-9 since monitoring began in June 2004; however, during the <br /> fourth quarter 2009 and 1010, small amounts (up to 0.01 ft) of SPH were observed. <br /> 5.5.2 Deep Zone Trends <br /> During 2010, sheen or measurable SPH was observed in wells MW-17, MW-43, MW-46 through <br /> MW-50, and MW-52. In the deep zone wells, sheen and SPH product was mainly observed on <br /> the northern section of the L&M OU and south of the Water Front Towers' parking lot. In the off <br /> Site deep zone wells, sheen has been observed in the Delta View Apartments in well MW-46 <br /> only. <br /> Wells MW-17 and MW-46 contained sheen during all four quarters of 2010. Wells MW-47 and <br /> MW-48 contained sheen during the 1Q10, and contained SPH during the 2Q10, 3Q10, and <br /> 4Q10. Wells MW-43, MW-49, MW-50, and MW-52 contained SPH during all four quarters of <br /> 2010. The highest observed SPH thickness for 2010 was in MW-50 (30.66 ft) during 2Q10. <br /> Wells MW-17, MW-43, MW-46 through MW-49, and MW-52 have had a decreasing trend since <br /> monitoring began, in 2005, or since sheen has been observed, in 2008. Well MW-50 has had a <br /> stable trend. Measurable SPH has not been observed in wells MW-17 and MW-46 since 2008. <br /> Measurable SPH has not been observed in well MW-47 since November 2006; however, during <br /> the recent three quarters 2010 (2Q10 through 4Q10), small amounts (up to 0.03 ft) of SPH were <br /> observed. Measurable SPH in wells MW-43, MW-48, MW-49, MW-50, and MW-52 ranged <br /> between 0.01 foot (MW-52) and 30.66 foot (MW-50) during 2010. <br /> SPH removal activities were conducted on B-Zone wells MW-17, MW-43, MW-46 through <br /> MW-50, and MW-52 during all four quarters 2010. During SPH removal events in 2010, <br /> approximately 15.25, 0.5, 1.5, 39.0, and 62.0 gallons of product were removed from wells <br /> MW-43, and MW-47 through MW-50, respectively. Each of these wells is located in the <br /> Waterfront Towers Parking facility north of the L&M OU. <br /> Iffidewater7W Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual QSSRQRSRQMR Stockton_FINAL.doc 5.3 <br />