My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> January 31, 2011 <br /> 8.0 Planned Activities for the First Quarter 2011 <br /> The following is a list of planned activities for the first quarter 2011: <br /> • Continue groundwater monitoring and sampling in accordance with MRP <br /> No. R5-2004-0820. (Implement new MRP following issuance from the RWQCB-CVR). <br /> • Continue sampling 19 new deeper B-, C-, and D- zone wells; and establish trending for <br /> C- and D- zones. <br /> • Continue with quarterly soil vapor point sampling. <br /> • Perform additional SPH removal events and continue with periodic monitoring and <br /> gauging of SPH wells. <br /> • Conduct meetings with the RWQCB-CVR to discuss groundwater remediation in the <br /> offsite wells north the L&M OU. <br /> • Submit report of findings for additional investigation of SPH extent in the Water Front <br /> Tower parking facility and results of the pilot study performed on GWE wells installed in <br /> the UOU. <br /> • Revisit requested changes to monitoring and reporting program with RWQCB-CVR. <br /> • Begin offsite assessment and pilot testing activities. <br /> I:\Tidewater\TW Stockton(Parcel 2A-0415)\Reports\QMR\2010\4010-Annual\4Q10 and Annual OSSRQRSRQMR Stockton_FINAL.doc 8.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.