My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 8:17:31 PM
Creation date
2/13/2020 3:05:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FOURTH QUARTER AND ANNUAL 2010 SITE STATUS, REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stan" Rancho Cordova Office Stantec Cons Ing Corporation 7Gog -L <br /> 3017 Kilgore Road Stantec Company Contact(s)for Invoice: PROJECt Afo DATE: <br /> Rancho Cordova, CA Dan Schreiner, Stantec Project ManagerPAGE: /U <br /> 211402828.300.250 t <br /> TEL: (916) 861-0400 FAX: (916)861-0430 email -anthony.giglini@stantec.com cc:kristen.burba@stantec.com OF <br /> Project Name: <br /> 40110 Monitoring and Sampling Event Sampler(s) Printed Name / Lab <br /> Address: ,,,,V GUtkt KIFF ANALYTICAL <br /> Parcel#2A SAMPL R(S): IGNATURE) IAB tlSE OH�Y <br /> W.Weber at N. Lincoln,Stockton, CA <br /> TURNAROUND TIME(BUSINESS DAYS) <br /> ❑ 10 DAYS X DAYS [712 HR ❑ 48 HR ❑ 24 HR ❑ <24 HR REQUESTED ANALYSIS <br /> 5-Day(Standard TAT) N <br /> O J <br /> a ' o °° <br /> SPECIAL INSTRUCTIONS OR NOTES: TEMPERATURE ON RECEIPT(C) m <br /> 0 d <br /> n� o <br /> 0 <br /> da w a N Z <br /> a ' LU <br /> °° <br /> c w av <br /> EDF Deliverable. Please use the following reporting limits: <br /> Semi VOC's- Lower than applicable water quality objective. ° E o x �° <br /> a <br /> VOC's-0.5 ppb; TPHg, TPHd, TPH motor oil-50 ppb; BTEX, MtBE, DIPE,TAME, 0 C D E LU -' <br /> EtBE-0.5 ppb; TBA-5 ppb,ethanol- 50 ppb, methanol- 100 ppb W u; _ <br /> 1-- m C F N <br /> m ur c m U m <br /> NO,OUSE. Field Sample Identification SAMPLING MAT-RIX CONTE PRESERVE a wa r N a E <br /> ONLY: DATE TIME H D w co H u7 Q O <br /> MW_9 HCl <br /> 2A-MW-12 Water 8 HCl X X X X (� <br /> 2A-MW-13 <br /> .:.:.:.:.:. <br /> 2A-MW-14 Wat <br /> MW-16 a er <br /> MW-17 a e <br /> MW-18 00 Water 8 HCI X X X X Q <br /> MW-19 <br /> Q) Relinquished by:(Signature) Received by:(Signature) Time: <br /> ((DD <br /> Ul <br /> Relinquished by: ignature) Received by:(Signature) Time: <br /> W <br /> Relinquished by:(Signature) Re by: ign r Ti e' <br />
The URL can be used to link to this page
Your browser does not support the video tag.