My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REVISED FEASIBILITY STUDY 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_REVISED FEASIBILITY STUDY 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:43:41 PM
Creation date
2/13/2020 3:16:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REVISED FEASIBILITY STUDY 2000
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Treadwell&Rollo <br /> • <br /> greatest excess cancer risk from soil and groundwater was 4E-05 for landscape maintenance <br /> workers and residents. <br /> Area 11 —HIs calculated for the PEA exceeded 1 for construction and landscape maintenance <br /> workers. Excess cancer risk slightly exceeded 1E-06 for landscape maintenance workers and <br /> residents, due to the presence of benzo(a)pyrene detected in one soil sample at 110 ug/kg. Soil <br /> lead concentrations exceeded acceptable levels for child and industrial receptors. The additional <br /> soil sampling and analyses performed during the RI was combined with the previous data to <br /> develop a more representative collection of analytical data for the Site. The RA indicated that <br /> the revised representative chemical concentrations yielded HIs that were less than 1 for all <br /> receptors, and predicted blood lead levels for residential children were 11.4 ug/dl. Total excess <br /> cancer risks ranged from 3.0E-05 for residents, to 1 E-06 for the construction workers. <br /> Area 20—PEA-calculated HIs exceeded 1 for construction and landscape maintenance workers <br /> • and resident receptors, due to the presence of arsenic. Excess cancer risk exceeded acceptable <br /> ranges for construction and landscape maintenance workers, and residents. Additional sampling <br /> and analysis for the RA indicated that HIs exceeded 1 for commercial industrial workers and <br /> residents. Total excess cancer risks ranged from 3.0E-04 for landscape maintenance workers to <br /> 5E-05 for commercial industrial workers. Predicted blood lead concentrations were less than <br /> 6 ug/dl for all receptors. <br /> 1.4.2 Operable Unit 2 <br /> Area 15 —HIs exceeding 1 for construction and landscape maintenance workers, and adult and <br /> child residents were calculated for the PEA and RA. Carcinogenic risks were within acceptable <br /> ranges for construction and commercial/industrial workers, and slightly exceeded that for <br /> landscape maintenance workers (based on PEA calculations). The excess cancer risk for <br /> residents was calculated as 2E-04, during the PEA. Arsenic in soil and benzene in the <br /> groundwater were the drivers. Blood lead levels were less than 10 ug/dl for each pathway. <br /> • <br /> 7 <br /> 25970318.PGS 15 November 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.