My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REVISED FEASIBILITY STUDY 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
55
>
2900 - Site Mitigation Program
>
PR0009302
>
ARCHIVED REPORTS_REVISED FEASIBILITY STUDY 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:43:41 PM
Creation date
2/13/2020 3:16:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REVISED FEASIBILITY STUDY 2000
RECORD_ID
PR0009302
PE
2960
FACILITY_ID
FA0004002
FACILITY_NAME
MORTON-ALCO
STREET_NUMBER
55
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13737004
CURRENT_STATUS
01
SITE_LOCATION
55 S LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Treadwell&Rollo <br /> • <br /> to operate. This recommendation may be revised should system performance evaluations be <br /> available. Estimated operation and maintenance costs are $4,000 per month, including <br /> equipment lease expenses and system operations and maintenance. <br /> Area 21 <br /> According to SJCEHD, a soil vapor extraction pilot test has been performed at Area 21 to <br /> determine the viability of using SVE to remediate soil and groundwater contamination. The test <br /> reportedly indicated that soil conditions were appropriate for SVE. No costs to construct and <br /> operate an SVE have been presented by the current owner. Based on our experience in similar <br /> conditions, we estimate that an eight-well SVE system with four air sparging wells could be <br /> installed and operated for 18 months for approximately $200,000. <br /> A Remedial Action Plan(RAP) is in preparation and is expected to be submitted to DTSC in <br /> • November 2000. <br /> • <br /> 42 <br /> 25970318.PGS 15 November 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.