Laserfiche WebLink
1 U <br /> Smith Teehnolo_ SM SAFETY PLAN <br /> 4 <br /> I <br /> I <br /> Physical Hazards <br /> Tas'k(s)....;.: Hazard ; Mitigation Measure <br /> 1 Heavy Equipment(Noise& Physical All heay!y equipment used on this project will <br /> contact) be in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal IbSHA Title 8, Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone applies to all personnel. The <br /> I exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> All equipment operators and ground crews <br /> working)in close proximity of heavy equipment <br /> will be supplied with ear protection. <br /> Dust The dust hazard will be mitigated by not <br /> allowing,ground crew to be located down wind <br /> of drilling and excavation activity. In addition, <br /> water will be applied to control the dust if <br /> visible Levels of dust are generated. <br /> i <br /> I <br /> i <br /> I <br /> i <br /> I r <br /> I I <br /> i <br /> PAGE <br /> s <br /> 4 <br />