My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
203
>
3500 - Local Oversight Program
>
PR0545378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:55:58 PM
Creation date
2/13/2020 3:48:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545378
PE
3528
FACILITY_ID
FA0006112
FACILITY_NAME
EDWARD PITTS
STREET_NUMBER
203
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
203 S LINCOLN AVE
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> I <br /> The chain-of-custody record will contain the following information: <br /> ✓ site name <br /> ✓ signature of collector <br /> ✓ date and time of collection <br /> ✓ sample identification number(s) <br /> ✓ number of containers in sample set <br /> ` ✓ description of sample and container(s) <br /> ✓ name and signature of persons, and the companies or agencies they represent, <br /> who are involved in the chain of possession <br /> ✓ inclusive dates and times of possession <br /> ✓ requested analysis for each sample <br /> 5.3 Delivery of Samples to Laboratory <br /> Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated to <br /> approximately 4°C for shipping. Shipping containers will be sealed with security tape to assure <br /> sample integritydurin shipping. Delivered samples will be accompanied by a chain-of-custody <br /> record. The laboratory shall note on the chain-of-,custody that samples were properly <br /> preserved and security tape was intact upon arrival. <br /> 6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION <br /> All equipment used for drilling and sampling will be decontaminated prior to use. All equipment used <br /> for collection of more than one sample, such as bailers and spoons, will be decontaminated between <br /> each use to prevent cross contamination between samples. Driiling equipment will be decontaminated <br /> prior to commencing drilling at each hole. Well construction 'materials will be cleaned as necessary, <br /> I <br /> prior to installation. <br /> r <br /> W:1Admin\ShelIs\QAQC-97.DOC <br /> I <br /> 4. <br />
The URL can be used to link to this page
Your browser does not support the video tag.