My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
203
>
3500 - Local Oversight Program
>
PR0545378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 5:55:58 PM
Creation date
2/13/2020 3:48:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545378
PE
3528
FACILITY_ID
FA0006112
FACILITY_NAME
EDWARD PITTS
STREET_NUMBER
203
Direction
S
STREET_NAME
LINCOLN
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
203 S LINCOLN AVE
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br /> Smith Technology Corporation <br /> Quality Assurance/Quality Control Plan <br /> Revised February 1995 <br /> } <br /> Product thickness is calculated by subtracting the depth to product from the depth to water. In <br /> addition,water elevations are adjusted for the presence of fuel with the following calculation: <br /> (Product Thickness) (8) +(Water Elevation) =Corrected Water Elevation <br /> .i <br /> i NOTE: The factor of 0.8 accounts for the density difference between water and petroleum <br /> hydrocarbons. <br /> Newly installed wells will be allowed to stabilize for 24 hours after development prior to free product <br /> inspection. <br /> An acrylic Surface Sampler will be used for visual inspection of the groundwater in order to note <br /> sheens (difficult to detect with the Interface Probe), odors, microbial action and sediments. The <br /> sampler is calibrated in inches and centimeters for visual inspection of product thickness. <br /> To reduce the potential for cross contamination between wells;the monitorings will take place in order <br /> from the least to most contaminated, if known. Wells containing free product will be monitored last. <br /> Between each well monitoring the equipment will be decontaminated. <br /> Water level data collected from the wells will be used to develop a groundwater contour map for the <br /> project site. Groundwater flow will be estimated to be perpendicular to equipotential lines drawn on <br /> the map. <br /> 'i <br /> k <br /> f <br /> W:\AdminlShe11s\QAQC-97.D0C <br /> f <br /> 8 <br /> 4 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.