Laserfiche WebLink
11 . Please include a copy of any studies ( soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site . <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> a . Water Supply: 'Pr IV4TE toeLLC ex(ST'OUG <br /> b. Sewage Disposal: jt'oo �?-,L. S --PT-t -rnvsK r Exis7iuG <br /> c . Storm Drainage: SEY-F ac u i o ALvAoNA ore-ka'.a <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service( s ) , and the distance of the extension(s ) : <br /> ou F <br /> d. Natural Gas : ProN6 ak, K [ EY-LSfiw(. <br /> e . Electricity: 'P G • � e, < zbSTau.'Td <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> !'�'aVtd PvbUt R6&A - CoEL1%b Road <br /> g . Fire: Distance to nearest fire station: 3 M,LE S <br /> h . Schools :— FRewc k CAMP 6,vdmmeK - 3 M ,4& EAsT U1.1 unty 14,�14 2 M,lL-s <br /> 2 . Describe any site alterations which result from the proposed-pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures, number of trees removed, etc. ) . <br /> 0V O iV E <br /> 3 . Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> mnJE gP.Sloe"e- aUeAoy IN USE <br /> 1.3 <br /> Types of emissions and sources associated with project <br /> Nc)NE <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project C <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? ;I'NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> NONE <br /> Irrigated Not irrigated <br /> Minor Subdivision - 9 - ( 6/86 ) <br />