My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_PRELIMINLARY SUBSURFACE INVESTIGATION
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
402
>
2900 - Site Mitigation Program
>
PR0009254
>
ARCHIVED REPORTS_PRELIMINLARY SUBSURFACE INVESTIGATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 10:24:53 PM
Creation date
2/14/2020 4:58:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
PRELIMINLARY SUBSURFACE INVESTIGATION
RECORD_ID
PR0009254
PE
2960
FACILITY_ID
FA0004004
FACILITY_NAME
WESTERN PACIFIC RR PROPERTY
STREET_NUMBER
402
Direction
N
STREET_NAME
LINCOLN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
137-230-06-6
CURRENT_STATUS
02
SITE_LOCATION
402 N LINCOLN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be decontaminated prior to commencing drilling at each <br /> hole. Well construction materials will be cleaned as <br /> necessary, prior to installation. <br /> Equipment and well material decontamination will be <br /> conducted on an impermeable surface and all decontamination <br /> ' effluent will be contained. All surfaces of the equipment <br /> will be thoroughly decontaminated using a steam cleaner. <br /> The equipment will be placed on a drying rack for air <br /> drying. The decontamination water will stored in containers <br /> certified for hazardous materials storage and disposed of in <br /> an approved manner. <br /> ' Sample equipment to be used for pesticides and organic <br /> analysis will be washed in a nonphosphate detergent (Alconoa <br /> or equivalent) and rinsed with tap water, followed by <br /> deionized water and finally with acetone. If the equipment <br /> Is for metals analysis, the initial rinse will be conducted <br /> with 0. 1 N nitric acid followed by tap water and deionized <br /> water. <br /> ' 7.0 Field Equipment Calibration and Maintenance <br /> ' The following measuring equipment may be used during the <br /> Remedial Investigation. Equipment is grouped by field <br /> activity. Calibration procedures and frequency are listed <br /> for each piece. <br /> Soil Borings and Well Dimensions-Steel and coated cloth <br /> tape. Calibration: none. <br /> ' Water Level Measurements in Wells- Steel surveyors tape. <br /> Calibration: manufacturer supplied temperature correction <br /> will be applied as applicable for field conditions. <br /> Electrical well sounders. Calibration: check against steel <br /> surveyor's tape. <br /> ' Organic Vapors- Photoionization detector. Calibration: <br /> Daily field Calibration using a isobutylene standard as per <br /> manufacturers instructions. <br /> ' Groundwater pH Measurement- Digital pH meter. Calibration: <br /> standard pH solutions of 4, 7, and 10 will be utilized for <br /> ' daily field calibration according to manufacturers <br /> instructions. <br /> Electrical Conductivity- Electrical conductivity meter. <br /> ' Calibration: factory-calibrated annually and periodically <br /> calibrated against laboratory prepared standard calibration <br /> solution. <br /> Water Temperature- Mercury or digital thermometers . <br /> Calibration: factory-calibrated once. <br />
The URL can be used to link to this page
Your browser does not support the video tag.