Laserfiche WebLink
01 October 2019 <br />AGE Project No. 19-4850 <br />Page 7 of 14 <br />6.0. PERCOLATION TEST INFORMATION <br /> <br />A percolation soil suitability test was performed at the site under EHD permit No. <br />SR0081127 using a four-inch diameter soil boring established to a depth of 42 inches <br />bsg. A site map showing the approximate location of the percolation test hole is illustrated <br />in Figure 2. A precise description of the location and construction of the percolation test <br />hole is included in Appendix C (EHD form 42-03 revised 11/02/2009). The soil suitability <br />study was conducted south of the existing septic system leach field. <br /> <br /> <br />6.1. NUMBER OF PERCOLATION TESTS PERFORMED <br /> <br />One shallow percolation test was performed at the site. The appropriate percolation test <br />procedure established by the EHD was followed for the test (Procedure #2). The <br />percolation test hole was pre-soaked overnight for 24-hour followed by a four-hour <br />percolation testing period. <br /> <br /> <br />6.2. CONSTRUCTION OF PERCOLATION TEST HOLE <br /> <br />On 17 September 2019, one boring was advanced for a shallow percolation test. The <br />boring was advanced using a four-inch diameter hand auger to a depth of 42 inches bsg. <br />The boring was located south of the existing septic system disposal field. Following <br />borehole advancement, the sides of the boring were scraped, and loose material was <br />removed from the borehole. Once the borehole was cleared of loose material, two inches <br />of fine gravel was added to the borehole. The borehole was then filled with water to a <br />depth of 12 inches above the gravel at the time of 0820. The test hole was then covered <br />for 24 hours to allow for complete saturation of the borehole. <br /> <br /> <br />6.3. DESCRIPTION OF THE PERCOLATION TEST HOLE - POST SOAK <br /> <br />On 18 September 2019, the boring was found to be completely dry, intact and in good <br />condition. <br /> <br /> <br />6.4. PERCOLATION TEST CONFORMED TO SJC POLICY EHD 98-02 <br /> <br />The work was performed in accordance with San Joaquin County Division 11 Section <br />9-1105.2 (d) General Requirements. <br /> <br />On 18 September 2019, the percolation test hole was dry after sitting overnight. <br />Percolation test procedure #2 was performed by adding water to approximately six inches <br />above the gravel and recording the amount of water remaining in the borehole at 30- <br />minute intervals for a period of four hours. Additional water was added to the boring after <br />each 30-minute interval as required to ensure that approximately six inches of water <br />remained above the gravel. The water level was measured from a fixed reference point