My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
INSTALL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2020 2:58:30 PM
Creation date
2/18/2020 1:47:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-i"RVICES <br /> �;AN ►( );\(.,Jl SIN ( ( )UN Fi° ;:-„,rr.co. <br /> VNVIUM011;NTAI, III'ALT11 I)INASION N . <br /> I(n►(^:1 NI. Viijin►(►1(►, M. I)., rI.IAL, Aciin}; Ileiihli O((icer <br /> MI I . lVellrr Ave., 'I I►irrl Moor R P O. Box 388 SI(►cklmi, CA 95201-0388 <br /> November 15, 1996 <br /> Dale Boyett <br /> Boyett Petroleum <br /> P.O. Box 1099 <br /> Salida, Ca 95368 <br /> RE : Proposed piping removal and underground tank system upgrade at <br /> 419 S . Main St . Manteca. <br /> Attachments for plan approval : <br /> 1 . Any piping changes must be indicated on "as built” drawing <br /> to be submitted prior to system final . <br /> 2 . State A and B forms must be submitted prior to system <br /> final . The forms should indicate all changes in the tank <br /> system. <br /> 3 . A new monitoring and response plan must be developed, <br /> submitted and approved prior to system final . <br /> 4 . State C form must be submitted prior to system final . <br /> 5 . All tightness results must be submitted prior to system <br /> final ( tightness test to be conducted after all work is <br /> completed and prior to system final ) . <br /> 6 . Piping must slope back toward piping sump. <br /> 7 . The piping must be equipped with a mechanical leak <br /> detector as indicated on the plan. <br /> Ernest M. Fujimoto, M.D. , M. P.H. <br /> Acting Health Officer <br /> Robert McClellon R.E.H. S . <br /> Environmental Health Division <br /> 1 I i, i i„ "I';.iii li ,nlnin( nunl� I Ic.�llh(. .uitirn i.r� <br />
The URL can be used to link to this page
Your browser does not support the video tag.