My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
4 (STATE ROUTE 4)
>
21000
>
2900 - Site Mitigation Program
>
PR0526373
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:09:14 AM
Creation date
2/18/2020 2:15:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0526373
PE
2950
FACILITY_ID
FA0017846
FACILITY_NAME
VICTORIA ISLAND FARMS
STREET_NUMBER
21000
Direction
W
STREET_NAME
STATE ROUTE 4
City
HOLT
Zip
95234
APN
12919030
CURRENT_STATUS
01
SITE_LOCATION
21000 W HWY 4
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOTECHNICAL <br /> ENVIRONMENTAL <br /> EO WATER RESOURCES <br /> I N C O R P O R A T E D CONSTRUCTION SERVICES <br /> Project No. <br /> 8185.003.000 <br /> April 8, 2008 <br /> Ms. Lori Duncan <br /> Environmental Health Department, San Joaquin County <br /> 600 East Main Street <br /> Stockton, California 95202 <br /> Subject: APN 129-19-030—Victoria Canal Setback Levee and Site Work <br /> 21000 West State Route 4 <br /> San Joaquin County, California <br /> LETTER OF INTENT <br /> Dear Ms. Duncan: <br /> As requested by our client, ENGEO Incorporated plans to perform observation for the installation <br /> of geotechnical instrumentation at the subject property, located in the southern portion of <br /> Victoria Island in western San Joaquin County, California. The purpose of our services is to <br /> provide technical support during the installation of geotechnical instrumentation for client during <br /> the project. <br /> The project consists of the installation of a water pipeline across the southern portion of Victoria <br /> Island beginning at the Old River Pump Station and ending at the proposed pump station at the <br /> Victoria Canal Setback levee. During the installation of the tie-in at the Old River Station and <br /> Setback Levee, six monitor wells, 36 piezometer (nested in-tai.a borings) and one inclinometer <br /> will be installed in order to provide water lever data during and post construction. It is our <br /> understanding that the monitor wells will be used for water level information only and not for <br /> any water quality assessment or evaluation. <br /> If you have any questions, please call and we will be glad to discuss them with you. <br /> Very truly yours, <br /> ENGEO INCORPORATED j <br /> ,y <br /> ichard Ga oSf ,'l / ; sef J. T tle <br /> rg/vs l� <br /> 580 N.Wilma•Suite A•Ripon,CA 95366•(209)835-0610•Fax(888)279-2698 <br /> www.engeo.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.