Laserfiche WebLink
� Dynamic Back Pressure Test <br /> Atefordassss . _ eft 4162nd Street TP TP 201.4 <br /> Galt,Ca 95632 <br /> (209)744-0112(800)5249087 FAX(209)744-0116 ® Static Pressure Decay Test <br /> TP 2013 <br /> Owner/Contractor/Eng: TEST DATE: 5/28/15 TIME: UST AST ❑ <br /> TECHNICIAN NAME: <br /> Zane A.Nimmo SJV#0083 <br /> SITE NAME•'MANTECA EXPRESS MART ❑ PT ❑ Startup Test ® Compliance Test <br /> Address:419 S. MAIN ST. <br /> City: MANTECA, CA 95337 1 declare, under penalty ofperjury under the laws of the state Insvector: <br /> of California that based on information and belief formed <br /> Phone: after reasonable inquiry, the statements and information <br /> provided in the document are true,accurate,and complete. Present E] Not Present <br /> Contact: <br /> Confirmation# 15-20467 TECH SIGNATURE: ` ' l. V G <br /> OAI(E�- <br /> JUNI 2 6 2015 <br /> Permit or Facility#N-1159-1-3 <br /> #DISPENSERS 2 DISPENSER Make: GILBARCO NOZZLE Make: HEALY PV Valve Make:HUSKYVIRONM <br /> #TOTAL NOZZLES 4 Model: Model: 900 Model:5885 "^'-T7' ^r-r,"�Tr ncn'T <br /> MANIFOLDED: Yes ® No❑ BALANCE ASSIST Assist Type:VR 203 <br /> Tank 1 Tank 2 Tank 3 Tank4 TOTAL <br /> Fuel Grade 87 87 ALL Initial pressure before testing--0.08 tt we <br /> #Nozzles per Tank 4 — — 4 EQUIPMENT <br /> Actual Tank Capacity . 10,000 10,000 20,000 Decay: Blockage: <br /> Gasoline Volume 4,560 8,517 139077 Incline Manometer ❑ Incline Manometer ❑ <br /> Unage waparuy minae volume) 5,440 1,483 6,923 Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial PHIL TITE EVR <br /> Digital Manometer ® Digital Manometer ❑ <br /> Initial Test Pressure(tames w■ter)vo 2.00 Equipment Calibration Date: 4/13/15 <br /> 2.00 Drift Check End Value: .00 <br /> PSI 1 Minute(tarbes water) Nitrogen Intro.Point: 87 VA <br /> PSI @ 2 Minutes 2.01 <br /> Allowable <br /> PSI @ 3 Minutes 2 02 Fill Time 2 Win 4 32 <br /> PSI @ 4 Minutes 2.02 Time 1:2:15 <br /> Final Pressure @ 5 Minutes anrbea water) 2.03 Time 2: <br /> 1.76 <br /> Allowable Final Pressure(CARB) Time 3: <br /> Liquid Removal Cheeky Dynamic Back <br /> Pressure(if due),and Parts& <br /> PASS I Repairs Are Listed on Pae 2. <br />