My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 2:01:21 PM
Creation date
2/19/2020 10:04:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for'inventorycontrol: <br /> ❑ Check this box if no tank gauging or SIR equipment Is Installed. <br /> This section must be completed If in-tank gauging equipment is used to peifo m leak tectiommonitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper ent y and ter nination,Including testing for ground Yaulis? <br /> ❑;Yes" ti Nd*l Were all tahli"pauprhg probes visually irfspected Y and residue buildup? <br /> ❑7 yea ;.L3 No •- Was accu -s tem, <br /> ' racy of ys product level readings - s <br /> ❑" Yes ❑ No' Was accuracy of system water level readings tes ? <br /> ❑�Yes ❑ No' Were all probes reinstalled properly? <br /> ❑.Yes ❑ No' Were all Items on the equipment manufacturer's r 4htenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be co Tected. <br /> ine Leak Detectors(LLD): ❑ Check this t ox if LLD are not Installed. <br /> Complete efollowinm4achecklist: <br /> ®:_Yes ❑ No' .For aqulplfient startup or annual equipment i cation.was.a leak simulated to verify LLD performance? (Check all that appy)) <br /> ❑.. WA Sknulat d teak rate:.Z 3.g.p.h.; ❑0.1 g.p.h.; .E 10.2 g p•i. <br /> ® Yes .Nq tIFQa IkLlgs ccnfimped operational, aocurat thrfl ulatory rggultements7; <br /> ® Yes ❑ No' Was the testing apparatus property calibrated? <br /> ® Yes ❑ No'. For mechanical LLDS,does the LLD restrict prodt ct flow if i t detects a leak? <br /> ❑ N/A--,, <br /> ❑: Yes Q No' FtNeleclronk LLDs,does fire turbine automatical shut off If the LLD detects.a leak? <br /> ® WA. <br /> ❑.Yr3g ❑ No' Foratecitanie LLDs does the turbine automaticail shut off lif any portion of the monitoring system is disabled or disconnected? <br /> ® N/A <br /> Q'Yes ❑ No' For electronic LLD%does the turbine automaticali shut off if any portion ofthe monitoring system malfunctions.or We a test! <br /> ® WA <br /> ❑',Yes ❑ No' For electronic LLDs,have all accessible wiring c nections been visually inspected? <br /> ® N/A <br /> ❑ No' Were all items on the equipment manufacturer's aintenan x checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be cor ected. <br /> H. Comments: LDS <br /> 81 120 3 22 28 PASS <br /> 91 100. 2 21 26 PASS <br /> DSL 130 3 22 12 PASS <br /> r <br /> _.� .zn <br /> Monitoring System Certification Page 3 f 4 JUL j 12014 2/21/07 <br /> ENVIRONMENTI AL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.