My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 2:01:21 PM
Creation date
2/19/2020 10:04:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> Sp l Bucket Testing Report Form SWRCB,January 2006 <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed,form and <br /> printouts fi-om tests(f applicable), should be provided to the facility owner/operator for submittal to the local regulatmy agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: MANTECA ESPRESS MART I Date of Testing: 05-23-11 <br /> Facility Address: 419 SOUTH MAIN STREET MANTECA CA <br /> Facility Contact: Phone: <br /> Date Local Agency Was Notified of Testing . <br /> Name of Local Agency Inspector(f present during testing): SAN JOQUIN CO STACY <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 4162 nd Street Galt,CA 95632 (209)744-0112 Fax:(209)744-0116 <br /> Technician Conducting Test: ❑ Lyle D.Nimmo ❑ Zane A.Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br /> 5249115-UT 5263322-UT 5263373-UT 5273934-UT <br /> Credentials: ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used: TAPE/H2O Equipment Resolution: 1/16 <br /> Identify Spill Bucket (By Tank 1 87A 2 91 3 DIE 4 <br /> Number, Stored Product, etc. <br /> Direct Bu Direct Bury Direct Bury <br /> Bucket Installation Type: ® Bury ® Direct Bury El Contained in <br /> yp ❑ Contained in Sump ❑ Contained in Sump ❑ Contained in <br /> Sum Sum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 14 14 14 <br /> Wait time between applying <br /> vacuum/water and start of test: - <br /> Test Start Time(Ti): 908 908 908 <br /> Initial Reading(Ri): 13 1/8 13 5/8 13 7/8 <br /> Test End Time(TF): 1008 1008 1008 <br /> Final Reading(RF): 13 1/8 13 5/8 13 7/8 <br /> Test Duration(TF—Tj): I HOUR I HOUR 1 HOUR <br /> Change in Reading(RF-Rj): 0 0 0 <br /> Pass/Fail Threshold or _ <br /> Criteria: " <br /> Test Result: ® Pass ❑ Fail E Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Coin ments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date:05-23-11 <br /> State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br /> may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.