Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMEN <br /> 600 East Main Street, Stockton, California 952 -3029 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www. ov.or ehd/unitiii.htP <br /> CONTINUATION FORM Page: 3 of 3 <br /> Date: 05/23/11 <br /> OFFICIAL INSPECTION REPORT Program: UST <br /> Facility Address: 419 S. Main St., Manteca <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Co I <br /> ROUTINE ANNUAL INSPECTION AND MONITORING SYSTEM C TIFICATION <br /> Violations: (13, 17, 24) <br /> 13. The Bravo box float and chain in the UDC 3/4 for the dieselbe map/' fined o activate atefailed to stop han and auw ofdible <br /> an ct at <br /> the dispenser when tested. All monitoring equipment shall <br /> visual alarm or stop the flow of product at the dispenser when it det is a leak. The service technician <br /> adjusted the float and verified functionality. <br /> 17. The 91 line leak detector failed to detect a leak when tested.chn ci i adjusted the leak d tene leak detectors shall btor ,apable <br /> of detecting a 3-gallon per hour leak at 10 psi. The service to <br /> retested it, and it passed. <br /> was <br /> 24. Annual monitoring system certification, leak detectoreen testing, <br /> tt tpollthe EHD. A copy testing <br /> the test <br /> performed on May 28, 2010 and a test report has no <br /> report must be submitted within 30 days of the tests. Immediately bmit a copy of the test report to the <br /> � EHD. <br /> Complete and submit a copy <br /> of the Return to Compliance Certifica n to the EHD by June 23, 2011 <br /> along with a statement documenting the corrective actions that hav been or will be taken for each <br /> violation and any supporting paperwork <br /> d and approved at the tim of inspection. A copy was left on <br /> Note: The Response Plan was complete <br /> site. <br /> Note-. The plastic handle from a vehicle window squeegee was fou aat the <br /> abottom <br /> th°me ofenspectiondrop e The <br /> Not p <br /> the 87 tank. It did not appear to be interfering with the mechanic p <br /> are <br /> handle was removed from the tank by the technician on site. Mee ainta nedpersand fully f ed as al overfill <br /> all <br /> prevention at this facility. The overfill prevention systems mu <br /> st times. <br /> ents for this facility were l nth bmitted to the EHD in May 2010. <br /> Note The financial responsibility documocuments are duet Is <br /> Copies of current financial responsibility d <br /> Provided: Return to Compliance Certification form, Response Pla orm <br /> TE LED AT THE CURRENT <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES Wli BE HD,L CURRENT HOURLY HOURLY <br /> INSPECTION RATE. <br /> THIS FACILITY IS SUBJECT TO REt;122) <br /> TION AT ANY TIME A Title: <br /> Received By: <br /> EHD Inspector: <br /> CONTINUATION FORM <br /> EHD 23-0 Rev 08110/10 <br />