Laserfiche WebLink
F. In-Tank Gauging 1 SIR Equipment: Check this box if tank gauging is used only for Inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed rf in4ank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the followino checkl' t: <br /> Yes No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes No' Was accuracy of system product level readings tested? <br /> Yes NW Was accuracy of system water level readings tested? <br /> Yes I I No' Were all probes reinstalled property? <br /> Yes i I No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): i Check this box if LLDs are not installed. <br /> Com tete the followin checklist: <br /> x Yes No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check al! <br /> WA that apply) Simulated leak rate: x 3 g.p.h.; I: 0.1 g.p.h ; 0.2g-p.h. <br /> x Yes i i No` Were all LLDs confirmed operational and accurate wtthin regulatory requirements? <br /> Y. Yes I I No, Was the testing apparaWs property caGbraW? <br /> Yes No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> NIA <br /> YesNo` For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> it <br /> WA <br /> Yes : No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> it WA disconnected? <br /> Yes No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> a NIA fails a test? <br /> Yes !1 No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> M NIA <br /> Yes . No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or wilt be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 2/21/07 <br />