My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
419
>
2300 - Underground Storage Tank Program
>
PR0231433
>
COMPLIANCE INFO_2005 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 4:59:42 PM
Creation date
2/19/2020 10:50:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2009
RECORD_ID
PR0231433
PE
2361
FACILITY_ID
FA0003685
FACILITY_NAME
DBA CIRCLEK, REFUEL PETROLEUM INC.
STREET_NUMBER
419
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21938610
CURRENT_STATUS
01
SITE_LOCATION
419 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
347
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MVP PETR T EUM ENGINEERIN NC.A CALIFORNIA CORPORATION <br /> • PO Box 281 Folsom, CA 95763-0281• Phone(916)984.1537• Fax(916) 984-1117• Cellular(916)205-1537 <br /> Site Health and Safety Plan <br /> Site location: Express Market <br /> 419 S. main St. <br /> Manteca, Ca 95337 <br /> Work scope: Replacement of one UDC and connecting to the existing diesel product line adjacent to <br /> the existing dispenser with connection to the other dispenser. <br /> Site Foreman: Mario Lucero 916-214-1537 <br /> Site Safety Officer: Mark Vendeiro 916-205-1537 <br /> Potential Hazards: Excavation, bobcat operation with concrete breaking tool, trench work, truck loading, <br /> hand tool work, concrete exposure and general construction hazards <br /> Physical hazards: These are primarily associated with standard construction practices and the general nature <br /> of constriction work. MVP safety rules will be adhered to. <br /> Heat Slip, trip, fall Excavations <br /> Cold Noise Moving equipment <br /> Rain Underground hazards Traffic <br /> Fog Overhead hazards other <br /> Level of Protection: A <br /> Control Measures: Work area will be fenced or barricaded. There will be no smoking and no unauthorized <br /> entry. A fire extinguisher will be staged at the work area. <br /> Safety equipment available: Safety glasses, hearing protection, hard hats, gloves <br /> First aid kit, fire extinguisher, traffic cones, barricades <br /> Emergency information- <br /> Hospital: Kaiser Hospital and Emergency services <br /> 1777 West Yosemite Ave. <br /> Manteca, CA <br /> 209-825-3500 <br /> Ambulance, Police, Fire: 911 <br />
The URL can be used to link to this page
Your browser does not support the video tag.