My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19414
>
4700 - Waste Tire Program
>
PR0522804
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:03 PM
Creation date
2/19/2020 11:08:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4700 - Waste Tire Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0522804
PE
4725
FACILITY_ID
FA0009898
FACILITY_NAME
PGM RECYCLING INC
STREET_NUMBER
19414
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
01709001
CURRENT_STATUS
02
SITE_LOCATION
19414 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
CField
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATION PLAN C1WMB 501 (Rev.9/02) <br /> Page 5 of 5 <br /> IV. INDOOR STORAGE <br /> INDOOR STORAGE REQUIREMENTS-§17356 <br /> ❑ Meets NFPA 231 D Standards(attach verification) <br /> ® Alternative standards approved by the local fire authority(attach approval) <br /> V. MAP REQUIREMENTS(Minor facilities provide items a and b,Major facilities provide items a through f): <br /> a. General area location,with additional larger scale if needed to show proximity to nearest town,city,or major highway. <br /> b. Plot plan of site,drawn to scale,which shows: <br /> 1. Legal boundaries for which title or leasehold is held(attach copy of lease agreement for property,if applicable); <br /> 2. All buildings or structures on-site, indicating use;all other structures within 200 feet of site boundary; <br /> 3. Site access including road or street names; <br /> 4. Location of fences,gates,and other access control measures;and <br /> 5. Dimensions of existing and planned tire storage units, fire lanes, fire breaks. <br /> C. Site topography, including: <br /> I. Drainage swales,ditches,berms,surface waters,wetlands, 100 year floodplain boundary,and other drainage features; <br /> 2. Wooded areas;and <br /> 3. Other appropriate physical features. <br /> d. Loading,unloading,salvage,and processing areas. <br /> e. Locations of fire hydrants or wells for fire fighting water supply; indicate flow capacities of hydrants, mains,and wells. <br /> f. Site surface material,e.g.,asphalt,gravel,compacted earth,etc. <br /> VI. OPERATOR CERTIFICATION <br /> I certify that this document and all attachments were prepared under my direction or supervision. I have inquired of the persons <br /> directly responsible for gathering the information, and certify that the information submitted is, to the best of my knowledge and <br /> belief, true, accurate and complete. <br /> Operator Signature: <br /> Typed Name&Title: James A.Capis, President Date: 4/26/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.